Effinature × Taxonomie UE
EU Taxonomy: biodiversity objective 6 (DA (EU) 2023/2486)
Effinature provides evidence for 14 requirement(s) of EU Taxonomy: biodiversity objective 6 (DA (EU) 2023/2486).
Effinature feeds your Taxonomie UE disclosure
A single field certification, third-party-verified under ISO/IEC 17065, provides the evidence for 14 Taxonomie UE requirements.
Effinature provides evidence for 14 requirement(s) of EU Taxonomy: biodiversity objective 6 (DA (EU) 2023/2486)
Detailed correspondences (72)
| Framework provision | Effinature criterion | Relation | Confidence | Rationale |
|---|---|---|---|---|
| 2.1-SC Conservation, including restoration, of habitats, ecosystems and species - substantial contribution: implementation of conservation/restoration measures in accordance with a management plan, without conversion of high-value ecosystems. |
EFF-C-062
Areas set aside for biodiversity
|
Close match | High | Set-aside areas/EBS, the preservation of fauna and flora and ecological management plans implement habitat and species conservation/restoration measures. |
| 2.1-SC Conservation, including restoration, of habitats, ecosystems and species - substantial contribution: implementation of conservation/restoration measures in accordance with a management plan, without conversion of high-value ecosystems. |
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
|
Close match | High | Set-aside areas/EBS, the preservation of fauna and flora and ecological management plans implement habitat and species conservation/restoration measures. |
| 2.1-SC Conservation, including restoration, of habitats, ecosystems and species - substantial contribution: implementation of conservation/restoration measures in accordance with a management plan, without conversion of high-value ecosystems. |
EFF-C-100
Preservation of the initial plant heritage
|
Close match | Medium | Set-aside areas/EBS, the preservation of fauna and flora and ecological management plans implement habitat and species conservation/restoration measures. |
| 2.1-SC Conservation, including restoration, of habitats, ecosystems and species - substantial contribution: implementation of conservation/restoration measures in accordance with a management plan, without conversion of high-value ecosystems. |
EFF-C-108
Fauna preservation
|
Close match | Medium | Set-aside areas/EBS, the preservation of fauna and flora and ecological management plans implement habitat and species conservation/restoration measures. |
| 2.1-SC Conservation, including restoration, of habitats, ecosystems and species - substantial contribution: implementation of conservation/restoration measures in accordance with a management plan, without conversion of high-value ecosystems. |
EFF-C-074
Fauna preservation programme
|
Close match | Medium | Set-aside areas/EBS, the preservation of fauna and flora and ecological management plans implement habitat and species conservation/restoration measures. |
| 2.1-SC Conservation, including restoration, of habitats, ecosystems and species - substantial contribution: implementation of conservation/restoration measures in accordance with a management plan, without conversion of high-value ecosystems. |
EFF-C-065
Plant-heritage management plan
|
Close match | Medium | Set-aside areas/EBS, the preservation of fauna and flora and ecological management plans implement habitat and species conservation/restoration measures. |
| 2.1-SC Conservation, including restoration, of habitats, ecosystems and species - substantial contribution: implementation of conservation/restoration measures in accordance with a management plan, without conversion of high-value ecosystems. |
EFF-C-035
Specific management of the Structured Biodiversity Area (EBS)
|
Close match | Medium | Set-aside areas/EBS, the preservation of fauna and flora and ecological management plans implement habitat and species conservation/restoration measures. |
| 2.2-SC Rehabilitation and restoration of land towards a good ecological state or a return to the natural state (including soils and continuities), on the basis of an initial state and measurable ecological objectives. |
EFF-C-052
Initial soil state
|
Close match | High | The initial soil state, sustainable management and reuse of soil and pollution remediation restore the ecological quality of the site's soils. |
| 2.2-SC Rehabilitation and restoration of land towards a good ecological state or a return to the natural state (including soils and continuities), on the basis of an initial state and measurable ecological objectives. |
EFF-C-057
Sustainable soil management
|
Close match | High | The initial soil state, sustainable management and reuse of soil and pollution remediation restore the ecological quality of the site's soils. |
| 2.2-SC Rehabilitation and restoration of land towards a good ecological state or a return to the natural state (including soils and continuities), on the basis of an initial state and measurable ecological objectives. |
EFF-C-058
Prioritising on-site reuse of soil
|
Close match | Medium | The initial soil state, sustainable management and reuse of soil and pollution remediation restore the ecological quality of the site's soils. |
| 2.2-SC Rehabilitation and restoration of land towards a good ecological state or a return to the natural state (including soils and continuities), on the basis of an initial state and measurable ecological objectives. |
EFF-C-003
Soil quality
|
Close match | Medium | The initial soil state, sustainable management and reuse of soil and pollution remediation restore the ecological quality of the site's soils. |
| 2.2-SC Rehabilitation and restoration of land towards a good ecological state or a return to the natural state (including soils and continuities), on the basis of an initial state and measurable ecological objectives. |
EFF-C-030
Methodology for monitoring soil ecological quality
|
Close match | Medium | The initial soil state, sustainable management and reuse of soil and pollution remediation restore the ecological quality of the site's soils. |
| 2.2-SC Rehabilitation and restoration of land towards a good ecological state or a return to the natural state (including soils and continuities), on the basis of an initial state and measurable ecological objectives. |
EFF-C-053
Report on soil-deterioration phenomena
|
Related match | Medium | The initial soil state, sustainable management and reuse of soil and pollution remediation restore the ecological quality of the site's soils. |
| 7.1-SC-a Construction of new buildings - the site is not built on land of high biodiversity value (arable/high-yield crops, forests, natural grasslands, wetlands, threatened-species land). |
EFF-C-019
Assessment of ecological continuities and habitat characterisation
|
Close match | Medium | The assessment of ecological continuities, habitat characterisation and initial flora/fauna state make it possible to rule out siting on land of high biodiversity value. |
| 7.1-SC-a Construction of new buildings - the site is not built on land of high biodiversity value (arable/high-yield crops, forests, natural grasslands, wetlands, threatened-species land). |
EFF-C-061
Ecological continuities and habitat characterisation
|
Close match | Medium | The assessment of ecological continuities, habitat characterisation and initial flora/fauna state make it possible to rule out siting on land of high biodiversity value. |
| 7.1-SC-a Construction of new buildings - the site is not built on land of high biodiversity value (arable/high-yield crops, forests, natural grasslands, wetlands, threatened-species land). |
EFF-C-059
Flora analysis
|
Close match | Medium | The assessment of ecological continuities, habitat characterisation and initial flora/fauna state make it possible to rule out siting on land of high biodiversity value. |
| 7.1-SC-a Construction of new buildings - the site is not built on land of high biodiversity value (arable/high-yield crops, forests, natural grasslands, wetlands, threatened-species land). |
EFF-C-072
Fauna analysis
|
Close match | Medium | The assessment of ecological continuities, habitat characterisation and initial flora/fauna state make it possible to rule out siting on land of high biodiversity value. |
| 7.1-SC-a Construction of new buildings - the site is not built on land of high biodiversity value (arable/high-yield crops, forests, natural grasslands, wetlands, threatened-species land). |
EFF-C-055
Urban continuities
|
Related match | Low | The assessment of ecological continuities, habitat characterisation and initial flora/fauna state make it possible to rule out siting on land of high biodiversity value. |
| 7.1-SC-b Construction of new buildings - environmental impact assessment (EIA) carried out and appropriate mitigation measures implemented to protect biodiversity and ecosystems. |
EFF-C-070
Environmental impact assessment
|
Close match | High | The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures. |
| 7.1-SC-b Construction of new buildings - environmental impact assessment (EIA) carried out and appropriate mitigation measures implemented to protect biodiversity and ecosystems. |
EFF-C-114
Worksite monitoring
|
Close match | Medium | The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures. |
| 7.1-SC-b Construction of new buildings - environmental impact assessment (EIA) carried out and appropriate mitigation measures implemented to protect biodiversity and ecosystems. |
EFF-C-012
Site visits by the ecologist
|
Close match | Medium | The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures. |
| 7.1-SC-b Construction of new buildings - environmental impact assessment (EIA) carried out and appropriate mitigation measures implemented to protect biodiversity and ecosystems. |
EFF-C-071
Prefectural order of the environmental authority: flora component
|
Close match | Medium | The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures. |
| 7.1-SC-b Construction of new buildings - environmental impact assessment (EIA) carried out and appropriate mitigation measures implemented to protect biodiversity and ecosystems. |
EFF-C-079
Prefectural order of the environmental authority: fauna component
|
Close match | Medium | The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures. |
| 7.1-SC-b Construction of new buildings - environmental impact assessment (EIA) carried out and appropriate mitigation measures implemented to protect biodiversity and ecosystems. |
EFF-C-109
Preventive measures
|
Close match | Medium | The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures. |
| 7.1-SC-c Construction of new buildings - limited sealing: the design minimises soil artificialisation/sealing and maximises the vegetated / permeable surface. |
EFF-C-001
CBS (Biotope Area Factor) determination tool
|
Close match | High | The CBS/CBSh, the definition of open ground and combating sealing minimise land take and maximise vegetated/permeable areas. |
| 7.1-SC-c Construction of new buildings - limited sealing: the design minimises soil artificialisation/sealing and maximises the vegetated / permeable surface. |
EFF-C-004
Harmonised Biotope Area Factor (CBSh)
|
Close match | High | The CBS/CBSh, the definition of open ground and combating sealing minimise land take and maximise vegetated/permeable areas. |
| 7.1-SC-c Construction of new buildings - limited sealing: the design minimises soil artificialisation/sealing and maximises the vegetated / permeable surface. |
EFF-C-005
Definition of open ground (full soil)
|
Close match | High | The CBS/CBSh, the definition of open ground and combating sealing minimise land take and maximise vegetated/permeable areas. |
| 7.1-SC-c Construction of new buildings - limited sealing: the design minimises soil artificialisation/sealing and maximises the vegetated / permeable surface. |
EFF-C-006
Combating soil sealing and heat islands
|
Close match | High | The CBS/CBSh, the definition of open ground and combating sealing minimise land take and maximise vegetated/permeable areas. |
| 7.1-SC-c Construction of new buildings - limited sealing: the design minimises soil artificialisation/sealing and maximises the vegetated / permeable surface. |
EFF-C-054
Land use
|
Close match | Medium | The CBS/CBSh, the definition of open ground and combating sealing minimise land take and maximise vegetated/permeable areas. |
| 7.1-SC-c Construction of new buildings - limited sealing: the design minimises soil artificialisation/sealing and maximises the vegetated / permeable surface. |
EFF-C-099
Update of the CBSh (harmonised Biotope Area Factor)
|
Close match | Medium | The CBS/CBSh, the definition of open ground and combating sealing minimise land take and maximise vegetated/permeable areas. |
| 7.1-SC-d Construction of new buildings - stormwater management at plot level and preservation/restoration of ecological continuities and native vegetation on the site. |
EFF-C-068
Sustainable stormwater management
|
Close match | High | Sustainable stormwater management on the plot, ecological continuities and the native plant palette preserve/restore corridors and local vegetation. |
| 7.1-SC-d Construction of new buildings - stormwater management at plot level and preservation/restoration of ecological continuities and native vegetation on the site. |
EFF-C-067
Water-resource management plan
|
Close match | Medium | Sustainable stormwater management on the plot, ecological continuities and the native plant palette preserve/restore corridors and local vegetation. |
| 7.1-SC-d Construction of new buildings - stormwater management at plot level and preservation/restoration of ecological continuities and native vegetation on the site. |
EFF-C-055
Urban continuities
|
Close match | Medium | Sustainable stormwater management on the plot, ecological continuities and the native plant palette preserve/restore corridors and local vegetation. |
| 7.1-SC-d Construction of new buildings - stormwater management at plot level and preservation/restoration of ecological continuities and native vegetation on the site. |
EFF-C-063
Plant palette
|
Close match | Medium | Sustainable stormwater management on the plot, ecological continuities and the native plant palette preserve/restore corridors and local vegetation. |
| 7.1-SC-d Construction of new buildings - stormwater management at plot level and preservation/restoration of ecological continuities and native vegetation on the site. |
EFF-C-064
Choice of the plant palette
|
Close match | Medium | Sustainable stormwater management on the plot, ecological continuities and the native plant palette preserve/restore corridors and local vegetation. |
| 7.1-SC-d Construction of new buildings - stormwater management at plot level and preservation/restoration of ecological continuities and native vegetation on the site. |
EFF-C-018
Stormwater management along roads
|
Close match | Medium | Sustainable stormwater management on the plot, ecological continuities and the native plant palette preserve/restore corridors and local vegetation. |
| DNSH-BIO-EIE DNSH biodiversity (App. D 2023/2486) - an appropriate assessment (EIA / Natura 2000) is carried out and its conclusions/mitigation measures implemented; compliance with the Habitats/Birds directives. |
EFF-C-070
Environmental impact assessment
|
Close match | High | The environmental impact assessment and prefectural 'flora/fauna component' orders transpose the appropriate assessment under the Habitats/Birds Directives. |
| DNSH-BIO-EIE DNSH biodiversity (App. D 2023/2486) - an appropriate assessment (EIA / Natura 2000) is carried out and its conclusions/mitigation measures implemented; compliance with the Habitats/Birds directives. |
EFF-C-071
Prefectural order of the environmental authority: flora component
|
Close match | Medium | The environmental impact assessment and prefectural 'flora/fauna component' orders transpose the appropriate assessment under the Habitats/Birds Directives. |
| DNSH-BIO-EIE DNSH biodiversity (App. D 2023/2486) - an appropriate assessment (EIA / Natura 2000) is carried out and its conclusions/mitigation measures implemented; compliance with the Habitats/Birds directives. |
EFF-C-079
Prefectural order of the environmental authority: fauna component
|
Close match | Medium | The environmental impact assessment and prefectural 'flora/fauna component' orders transpose the appropriate assessment under the Habitats/Birds Directives. |
| DNSH-BIO-EIE DNSH biodiversity (App. D 2023/2486) - an appropriate assessment (EIA / Natura 2000) is carried out and its conclusions/mitigation measures implemented; compliance with the Habitats/Birds directives. |
EFF-C-027
Compliance with legislation
|
Related match | Medium | The environmental impact assessment and prefectural 'flora/fauna component' orders transpose the appropriate assessment under the Habitats/Birds Directives. |
| DNSH-BIO-SITE DNSH biodiversity - for activities on or near sensitive areas (Natura 2000, protected areas, key biodiversity areas), an adequate assessment is conducted and the negative impacts are avoided/mitigated. |
EFF-C-019
Assessment of ecological continuities and habitat characterisation
|
Close match | Medium | The assessment of ecological continuities, habitat characterisation and set-aside areas identify and protect the site's sensitive zones and nearby areas. |
| DNSH-BIO-SITE DNSH biodiversity - for activities on or near sensitive areas (Natura 2000, protected areas, key biodiversity areas), an adequate assessment is conducted and the negative impacts are avoided/mitigated. |
EFF-C-061
Ecological continuities and habitat characterisation
|
Close match | Medium | The assessment of ecological continuities, habitat characterisation and set-aside areas identify and protect the site's sensitive zones and nearby areas. |
| DNSH-BIO-SITE DNSH biodiversity - for activities on or near sensitive areas (Natura 2000, protected areas, key biodiversity areas), an adequate assessment is conducted and the negative impacts are avoided/mitigated. |
EFF-C-062
Areas set aside for biodiversity
|
Close match | Medium | The assessment of ecological continuities, habitat characterisation and set-aside areas identify and protect the site's sensitive zones and nearby areas. |
| DNSH-BIO-SITE DNSH biodiversity - for activities on or near sensitive areas (Natura 2000, protected areas, key biodiversity areas), an adequate assessment is conducted and the negative impacts are avoided/mitigated. |
EFF-C-055
Urban continuities
|
Related match | Low | The assessment of ecological continuities, habitat characterisation and set-aside areas identify and protect the site's sensitive zones and nearby areas. |
| DNSH-BIO-INVASIVE DNSH biodiversity - prevention of the introduction/propagation of invasive alien species and preservation of native species and habitats. |
EFF-C-102
Discovery of invasive alien plant species (EVEE) during works
|
Close match | High | The detection of EVEE on the worksite, spontaneous flora and the choice of a native plant palette prevent invasive alien species and preserve local species. |
| DNSH-BIO-INVASIVE DNSH biodiversity - prevention of the introduction/propagation of invasive alien species and preservation of native species and habitats. |
EFF-C-105
Choice, quality and provenance of plants
|
Close match | Medium | The detection of EVEE on the worksite, spontaneous flora and the choice of a native plant palette prevent invasive alien species and preserve local species. |
| DNSH-BIO-INVASIVE DNSH biodiversity - prevention of the introduction/propagation of invasive alien species and preservation of native species and habitats. |
EFF-C-063
Plant palette
|
Close match | Medium | The detection of EVEE on the worksite, spontaneous flora and the choice of a native plant palette prevent invasive alien species and preserve local species. |
| DNSH-BIO-INVASIVE DNSH biodiversity - prevention of the introduction/propagation of invasive alien species and preservation of native species and habitats. |
EFF-C-064
Choice of the plant palette
|
Close match | Medium | The detection of EVEE on the worksite, spontaneous flora and the choice of a native plant palette prevent invasive alien species and preserve local species. |
| DNSH-BIO-INVASIVE DNSH biodiversity - prevention of the introduction/propagation of invasive alien species and preservation of native species and habitats. |
EFF-C-020
Spontaneous flora
|
Related match | Medium | The detection of EVEE on the worksite, spontaneous flora and the choice of a native plant palette prevent invasive alien species and preserve local species. |
| DNSH-WATER DNSH water (App. B) - identification and management of the risks of water-quality degradation / water stress; control of discharges and the water resource. |
EFF-C-067
Water-resource management plan
|
Close match | Medium | The water-resource management and optimisation plan and sustainable stormwater management identify and control risks related to water quality and water stress. |
| DNSH-WATER DNSH water (App. B) - identification and management of the risks of water-quality degradation / water stress; control of discharges and the water resource. |
EFF-C-039
Water-resource optimisation report
|
Close match | Medium | The water-resource management and optimisation plan and sustainable stormwater management identify and control risks related to water quality and water stress. |
| DNSH-WATER DNSH water (App. B) - identification and management of the risks of water-quality degradation / water stress; control of discharges and the water resource. |
EFF-C-068
Sustainable stormwater management
|
Close match | Medium | The water-resource management and optimisation plan and sustainable stormwater management identify and control risks related to water quality and water stress. |
| DNSH-WATER DNSH water (App. B) - identification and management of the risks of water-quality degradation / water stress; control of discharges and the water resource. |
EFF-C-038
Reasonable water use
|
Related match | Medium | The water-resource management and optimisation plan and sustainable stormwater management identify and control risks related to water quality and water stress. |
| DNSH-POLLUTION DNSH pollution prevention (App. C) - limitation of the use and release of hazardous/polluting substances (pesticides, fertilisers, chemicals) into soil, water and air. |
EFF-C-047
Maintenance methods limiting pollution
|
Close match | High | Maintenance methods limiting pollution and pollution treatment/prevention control the use and release of hazardous substances (pesticides, fertilisers). |
| DNSH-POLLUTION DNSH pollution prevention (App. C) - limitation of the use and release of hazardous/polluting substances (pesticides, fertilisers, chemicals) into soil, water and air. |
EFF-C-115
Pollution treatment and risk prevention
|
Close match | High | Maintenance methods limiting pollution and pollution treatment/prevention control the use and release of hazardous substances (pesticides, fertilisers). |
| DNSH-POLLUTION DNSH pollution prevention (App. C) - limitation of the use and release of hazardous/polluting substances (pesticides, fertilisers, chemicals) into soil, water and air. |
EFF-C-080
Initial state of pollution
|
Close match | Medium | Maintenance methods limiting pollution and pollution treatment/prevention control the use and release of hazardous substances (pesticides, fertilisers). |
| DNSH-POLLUTION DNSH pollution prevention (App. C) - limitation of the use and release of hazardous/polluting substances (pesticides, fertilisers, chemicals) into soil, water and air. |
EFF-C-056
Ban on plastic for outdoor developments
|
Related match | Medium | Maintenance methods limiting pollution and pollution treatment/prevention control the use and release of hazardous substances (pesticides, fertilisers). |
| DNSH-CE-WASTE DNSH circular economy - management of construction/demolition waste: sorting, reuse, recycling, valorisation of excavated soil. |
EFF-C-116
Waste-management programme
|
Close match | High | Waste management and monitoring plans/programmes, green-waste management and on-site soil reuse ensure sorting, reuse and recovery. |
| DNSH-CE-WASTE DNSH circular economy - management of construction/demolition waste: sorting, reuse, recycling, valorisation of excavated soil. |
EFF-C-015
Waste management plan
|
Close match | Medium | Waste management and monitoring plans/programmes, green-waste management and on-site soil reuse ensure sorting, reuse and recovery. |
| DNSH-CE-WASTE DNSH circular economy - management of construction/demolition waste: sorting, reuse, recycling, valorisation of excavated soil. |
EFF-C-117
Waste monitoring
|
Close match | Medium | Waste management and monitoring plans/programmes, green-waste management and on-site soil reuse ensure sorting, reuse and recovery. |
| DNSH-CE-WASTE DNSH circular economy - management of construction/demolition waste: sorting, reuse, recycling, valorisation of excavated soil. |
EFF-C-104
Green-waste management
|
Close match | Medium | Waste management and monitoring plans/programmes, green-waste management and on-site soil reuse ensure sorting, reuse and recovery. |
| DNSH-CE-WASTE DNSH circular economy - management of construction/demolition waste: sorting, reuse, recycling, valorisation of excavated soil. |
EFF-C-058
Prioritising on-site reuse of soil
|
Close match | Medium | Waste management and monitoring plans/programmes, green-waste management and on-site soil reuse ensure sorting, reuse and recovery. |
| DNSH-ADAPT DNSH climate-change adaptation (App. A) - assessment of physical climate risks and adaptation measures (including limitation of heat islands through greening). |
EFF-C-006
Combating soil sealing and heat islands
|
Narrow match | Medium | Combating heat islands through building greening and controlled sealing constitutes an adaptation response, without a formalised climate-risk analysis. |
| DNSH-ADAPT DNSH climate-change adaptation (App. A) - assessment of physical climate risks and adaptation measures (including limitation of heat islands through greening). |
EFF-C-066
Building greening
|
Related match | Low | Combating heat islands through building greening and controlled sealing constitutes an adaptation response, without a formalised climate-risk analysis. |
| DNSH-ADAPT DNSH climate-change adaptation (App. A) - assessment of physical climate risks and adaptation measures (including limitation of heat islands through greening). |
EFF-C-021
Greening and buildings
|
Related match | Low | Combating heat islands through building greening and controlled sealing constitutes an adaptation response, without a formalised climate-risk analysis. |
| MONITORING-PLAN Post-delivery ecological monitoring and management plan ensuring the maintenance over time of the conservation/restoration measures (obj.6, activities 2.1/2.2). |
EFF-C-124
Effinature ecological assessment: End of operation
|
Close match | High | Effinature's end-of-operation ecological assessment, the updating of indices (ITCE/IVE) and management plans ensure the monitoring and maintenance of measures over time. |
| MONITORING-PLAN Post-delivery ecological monitoring and management plan ensuring the maintenance over time of the conservation/restoration measures (obj.6, activities 2.1/2.2). |
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
|
Close match | Medium | Effinature's end-of-operation ecological assessment, the updating of indices (ITCE/IVE) and management plans ensure the monitoring and maintenance of measures over time. |
| MONITORING-PLAN Post-delivery ecological monitoring and management plan ensuring the maintenance over time of the conservation/restoration measures (obj.6, activities 2.1/2.2). |
EFF-C-036
Update of the Ecological Value Index (IVE management)
|
Close match | Medium | Effinature's end-of-operation ecological assessment, the updating of indices (ITCE/IVE) and management plans ensure the monitoring and maintenance of measures over time. |
| MONITORING-PLAN Post-delivery ecological monitoring and management plan ensuring the maintenance over time of the conservation/restoration measures (obj.6, activities 2.1/2.2). |
EFF-C-069
Sustainable management of plant heritage
|
Close match | Medium | Effinature's end-of-operation ecological assessment, the updating of indices (ITCE/IVE) and management plans ensure the monitoring and maintenance of measures over time. |
| MONITORING-PLAN Post-delivery ecological monitoring and management plan ensuring the maintenance over time of the conservation/restoration measures (obj.6, activities 2.1/2.2). |
EFF-C-044
Fauna monitoring
|
Related match | Medium | Effinature's end-of-operation ecological assessment, the updating of indices (ITCE/IVE) and management plans ensure the monitoring and maintenance of measures over time. |
| MIN-SAFEGUARDS Minimum safeguards (art. 18) - compliance with the OECD/UN Guiding Principles, legality and due-diligence procedures (human rights, governance) at company level. |
EFF-C-027
Compliance with legislation
|
Related match | Low | Compliance with legislation reflects a legality requirement but does not cover the OECD/UN due diligence of the minimum safeguards. |
| MIN-SAFEGUARDS Minimum safeguards (art. 18) - compliance with the OECD/UN Guiding Principles, legality and due-diligence procedures (human rights, governance) at company level. |
EFF-C-092
Adherence to the Effinature ecological charter
|
Related match | Low | Adherence to the ecological charter is a formal commitment, without equivalence to the due diligence of the minimum safeguards. |
Source & licence
- Publisher : IRICE (groupe NORMAXIS)
- Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
- Dataset version : 9.1
- Licence : CC BY-ND 4.0