Ce site utilise des cookies strictement nécessaires à son fonctionnement et des cookies de mesure d'audience (Matomo, hébergé en France). Aucune donnée n'est transmise à des tiers.

EFF-C-012 : Site visits by the ecologist

Effinature criterion · theme: Species and habitats

The Effinature criterion “Site visits by the ecologist” (EFF-C-012) belongs to the Species and habitats theme and applies to the EVO reference framework(s). It maps to 13 international provision(s), including strong matches with Taxonomie UE (7.1-SC-b), GRESB (GRESB-BI1-EXTREV), GBF (Target 12).

Species and habitats Développement du patrimoine végétal Level : exigence EVO

International correspondences (13)

Framework Provision Relation Confidence Rationale
Taxonomie UE 7.1-SC-b Close match Medium The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures.
GRESB GRESB-BI1-EXTREV Narrow match Indicative (50%) Site visits by the ecologue provide independent expert verification of on-site ecological delivery.
GBF Target 12 Narrow match Medium These requirements for the choice, planting, management and monitoring of plant heritage improve the quality and durability of urban green spaces, contributing more specifically to the target's objective.
SNB 2030 SNB-M14 Close match Medium Worksite visits by the ecologist mobilise the ecological-engineering sector.
Code env. R411-6-a-14 Close match Medium (65%) Worksite visits by the ecologist correspond to the intervention protocol supervised by a qualified professional required in the derogation file.
Doctrine ERC ERC-P14 Close match High Worksite visits by the ecologist ensure the intervention of a qualified professional in monitoring the measures.
Labels complémentaires LPO-18 Close match Medium (65%) Worksite/site visits by the ecologist = expert support.
BNG BNG-07 Close match Medium (65%) The use of a competent ecologist for the survey, metric and plan overlaps with Effinature's criteria for team skills, site visits by the ecologist and training of the Biodiversity Partner.
IFC PS6 PS6-§8 Close match Medium (72%) The requirement for competent professionals/external experts overlaps with Effinature's criteria for team skills, ecologist, Biodiversity Partner and specialised experts.
ESS6 ESS6-§9-expertise Close match Medium (72%) The requirement for competent biodiversity expertise overlaps with Effinature's criteria for team skills, ecologist, Biodiversity Partner and specialised experts.
EP4 EP-P7 Related match Indicative (50%) The requirement for a competent independent environmental consultant overlaps with Effinature's team-skills, ecologist, Biodiversity Partner and expert criteria; however, its purpose (independent lender's review) differs from the ecological-execution mission.
EP4 EP-P9 Close match Medium (60%) Principle 9's independent monitoring and long-term reporting correspond to Effinature's site visits by the ecologist and documented worksite monitoring.
BREEAM Communities LE 01 Related match Indicative (45%) Site visits by the ecologist reflect the involvement of a qualified ecologist required by LE01.

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0