EFF-C-067 : Water-resource management plan
Effinature criterion · theme: Stormwater management
The Effinature criterion “Water-resource management plan” (EFF-C-067) belongs to the Stormwater management theme and applies to the EVO/HOR/NCO reference framework(s). It maps to 36 international provision(s), including strong matches with ESRS E4 (E4-2), TNFD (C3.0), TNFD (C3.0).
International correspondences (36)
| Framework | Provision | Relation | Confidence | Rationale |
|---|---|---|---|---|
| ESRS E4 | E4-2 | Narrow match | Indicative (50%) | The water-resource management plan formalises a sustainable-management policy linked to ecosystems. |
| TNFD | C3.0 | Close match | Medium | Management plans and water-resource optimisation, with meter readings, measure water withdrawal and consumption in the sense of C3.0. |
| TNFD | C3.0 | Close match | Medium | Management plans and water-resource optimisation, with meter readings, measure water withdrawal and consumption in the sense of C3.0. |
| TNFD | C3.0 | Close match | Medium | Management plans and water-resource optimisation, with meter readings, measure water withdrawal and consumption in the sense of C3.0. |
| SBTN | S1a-R5 | Broad match | Low | Effinature covers, at project level, several of the SBTN pressure categories (land use/sealing, water use, soil and water pollution, land use), but not the full screening exercise of the eight pressures or the marine/GHG realms. |
| SBTN | S1b-R14 | Broad match | Low | The initial state and soil quality, land use, water-resource management and pollution treatment directly assess at site level the same land (soil use/pollution) and freshwater (water use/pollution) pressures as SBTN, the difference being scale (site vs value chain). |
| Taxonomie UE | 7.1-SC-d | Close match | Medium | Sustainable stormwater management on the plot, ecological continuities and the native plant palette preserve/restore corridors and local vegetation. |
| Taxonomie UE | DNSH-WATER | Close match | Medium | The water-resource management and optimisation plan and sustainable stormwater management identify and control risks related to water quality and water stress. |
| GRESB | GRESB-SITE-STORM | Close match | Medium (60%) | Water-resource management plan governs stormwater/rain-garden ecosystem management. |
| GBF | Target 11 | Narrow match | Medium | Water-resource management, soil health, the installation of beehives and the provision of resources for pollinators strengthen ecosystem services (water, soils, pollination) explicitly cited by the target. |
| GBF | Target 12 | Close match | High | The core of the Effinature standard (creating green spaces (plant heritage, CBS, open ground, building greening) and blue spaces (stormwater), ecological continuities and user well-being/connection to nature in the built environment) corresponds directly to the increase in area, quality and connectivity of urban green and blue spaces targeted by the goal. |
| SNB 2030 | SNB-M02 | Related match | Medium | The water-resource management plan organises the renaturated stormwater management. |
| SNB 2030 | SNB-M13 | Close match | Medium | The water-resource management plan organises a sustainable management of water. |
| HQE | HQE-BD-C5.2 | Related match | Low | Stormwater management at plot level overlaps with the water-resource management plan. |
| HQE | HQE-AMT-O8 | Close match | Medium | The management and protection of the water cycle overlaps with the water-resource management plan. |
| ÉcoQuartier | Engagement 19 | Broad match | High | The ÉcoQuartier's preservation/management of the water resource encompasses this Effinature requirement (sustainable stormwater management, reasonable water use, water-resource management plan). |
| BNG | BNG-10 | Close match | Medium (62%) | The 30-year habitat management and monitoring plan corresponds to Effinature's sustainable management plans (plant heritage, water resource, EBS, fauna) and maintenance arrangements (mowing, watering, upkeep of vegetated areas), even though the 30-year contractual horizon is specific to the BNG regime. |
| IFC PS6 | PS6-§24 | Narrow match | Indicative (50%) | Effinature's water-resource management plan effectively addresses a priority ecosystem service (water regulation/provisioning), a partial and targeted response to the systematic review of PS6. |
| IFC PS6 | PS6-§25 | Close match | Medium (60%) | Mitigating impacts on priority ecosystem services and resource efficiency overlaps with sustainable water management, combating heat islands and building greening. |
| ESS6 | ESS6-§11c-services | Narrow match | Indicative (50%) | The affected ecosystem services (water regulation, heat islands, water supply) assessed by ESS6 overlap with Effinature's management of the water resource, stormwater and combating heat islands. |
| EP4 | EP-P4 | Related match | Indicative (40%) | Effinature's management plans (plant heritage, water resource, sustainable management) and worksite monitoring cover, by topic, part of the measures that an EP4 ESMP aggregates into a single plan. |
| DGNB | ENV4-A | Close match | Medium | Plan for water resource management overlaps DGNB water criterion. |
| Green Star | GSB-NAT-WATERWAY | Related match | Low | Both entail a plan/strategy for the water resource; Effinature's plan de gestion de la ressource en eau overlaps with waterway protection planning. |
| Green Mark / CBI | GM-WATERQTY | Related match | Low | The water-resource management plan frames sustainable stormwater management. |
| Green Mark / CBI | SI-19 | Related match | Low | The water-resource management plan covers the blue-space component of indicator 19. |
| Estidama | PW-1 | Related match | Medium | Water-resource management plan including landscape watering. |
| ISO 17620 | 7.3.14 | Narrow match | Medium (60%) | The water-resource management plan completes the management plan for the gain measures. |
| ACT Biodiv | 2.2 | Narrow match | Indicative (45%) | The water-resource management plan is a management practice reducing water withdrawals. |
| BREEAM LE | POL03 | Related match | Medium (70%) | The water-resource management plan integrates the control of stormwater run-off. |
| BREEAM Communities | SE 13 | Narrow match | Indicative (45%) | The water-resource management plan is part of flood-risk management, as an operational sub-component. |
| BREEAM Communities | RE 03 | Close match | Medium (60%) | Effinature's water-resource management plan corresponds to the water strategy (efficiency, reuse) of RE03. |
| LEED | AÉS Crédit : Gestion des eaux pluviales | Close match | Medium (72%) | The on-site stormwater management strategy falls under Effinature's water-resource management plan. |
| SITES | Water C3.3 | Related match | Medium (60%) | Enhanced stormwater management = water- and stormwater-resource management plan. |
| LEED-ND | SS-C1 | Related match | Indicative (45%) | Water-resource management plan (EFF-C-067) - stormwater management at source. |
| LEED-ND | GIB-C9 | Related match | Indicative (30%) | Water-resource management plan (EFF-C-067) - reuse/treatment of wastewater on site (broad). |
| ARB IdF | IND-11 | Close match | High | The water-resource management plan formalises on-plot stormwater management. |
Source & licence
- Publisher : IRICE (groupe NORMAXIS)
- Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
- Dataset version : 9.1
- Licence : CC BY-ND 4.0