EFF-C-114 : Worksite monitoring

Effinature criterion · theme: Mitigation hierarchy

The Effinature criterion “Worksite monitoring” (EFF-C-114) belongs to the Mitigation hierarchy theme and applies to the EVO/HOR/NCO reference framework(s). It maps to 33 international provision(s), including strong matches with TNFD (Risk & impact management B), TNFD (Risk & impact management B), TNFD (Risk & impact management B).

Mitigation hierarchy Réduction des impacts du projet Level : exigence EVO HOR NCO

International correspondences (33)

Framework Provision Relation Confidence Rationale
TNFD Risk & impact management B Close match Medium Worksite monitoring, preservation and prevention measures apply the avoid-reduce hierarchy, at the heart of the impact-management process.
TNFD Risk & impact management B Close match Medium Worksite monitoring, preservation and prevention measures apply the avoid-reduce hierarchy, at the heart of the impact-management process.
TNFD Risk & impact management B Close match Medium Worksite monitoring, preservation and prevention measures apply the avoid-reduce hierarchy, at the heart of the impact-management process.
TNFD RE.C2.0 / EH.C2.0 Close match Medium Worksite pollution treatment and risk prevention manage and monitor the accidental spills targeted by RE.C2.0.
TNFD RE.C2.0 / EH.C2.0 Close match Medium Worksite pollution treatment and risk prevention manage and monitor the accidental spills targeted by RE.C2.0.
TNFD RE.C2.0 / EH.C2.0 Close match Medium Worksite pollution treatment and risk prevention manage and monitor the accidental spills targeted by RE.C2.0.
SBTN S1b-R15 Broad match Low Worksite monitoring and initial states cover all the project's footprints for material pressures, which overlaps with the comprehensive assessment of direct-operation locations; SBTN scope is broader (company multi-site).
SBTN S1b-R17 Broad match Low In-situ measurements and monitoring (water meter readings, soil ecological-quality monitoring methodology, worksite monitoring) provide measurement data for pressures, consistent with SBTN's priority on measurement; SBTN frames the entire value chain.
Taxonomie UE 7.1-SC-b Close match Medium The environmental impact assessment, worksite monitoring by the ecologist and fauna/flora preservation programmes constitute the EIA and its mitigation measures.
CDP 2.1 (Bio) Close match Medium Worksite monitoring ensures the ongoing management of identified impacts (manage).
GBF Target 7 Narrow match Medium The control of worksite and operational pollution, the ban on outdoor plastic, maintenance methods limiting chemical inputs and waste management reduce the risks and impacts of pollution on biodiversity.
GBF Target 21 Narrow match Medium Team training, user awareness-raising, professional skills and ecological monitoring/indices strengthen communication, education, monitoring and knowledge management on biodiversity at the project level.
Loi biodiv 2016 BIO-01 Related match Medium Effinature's worksite monitoring helps verify the effective avoidance and reduction of impacts during the works, an operational component of the Avoid-Reduce-Offset sequence.
Code env. R122-5-suivi Close match Medium (65%) Worksite monitoring corresponds to the arrangements for monitoring the implementation of Avoid-Reduce-Offset measures.
Doctrine ERC ERC-P1 Broad match Medium Effinature's worksite monitoring verifies the ordered application of the Avoid-Reduce-Offset measures throughout the operation.
Doctrine ERC ERC-P10 Broad match Medium Worksite monitoring documents the implementation and allows corrective measures.
HQE HQE-BD-C3 Related match Low The monitoring of the low-impact worksite overlaps with Effinature's worksite monitoring.
UICN SfN Critère 7 Related match Medium Worksite monitoring provides monitoring data allowing adjustment during the intervention.
ÉcoQuartier Engagement 20 Related match Medium Avoid-Reduce-Offset approach and environmental authorisation: serves the preservation of ÉcoQuartier natural environments but falls under specific regulatory procedures.
BNG BNG-05 Close match Medium (72%) BNG's avoid-minimise-restore/create mitigation hierarchy corresponds to Effinature's preservation, prevention, set-aside and biodiversity-area creation measures applied throughout the operation.
Crédits biodiv BC-P08 Related match Indicative (50%) Worksite monitoring feeds the independent control of the works.
IFC PS6 PS6-§7 Close match Medium (78%) PS6's avoid-reduce-restore sequence corresponds to Effinature's preservation, prevention and set-aside measures applied throughout the operation.
ESS6 ESS6-§9 Close match Medium (76%) ESS6's avoid-reduce-restore sequence corresponds to Effinature's preservation, prevention and set-aside measures applied throughout the operation.
ESS6 ESS6-§12 Close match Medium (65%) Risk management according to the mitigation hierarchy and ESS6's adaptive approach are found in Effinature's worksite monitoring, prevention measures and preservation programme.
EP4 EP-P4 Related match Indicative (40%) Effinature's management plans (plant heritage, water resource, sustainable management) and worksite monitoring cover, by topic, part of the measures that an EP4 ESMP aggregates into a single plan.
EP4 EP-P8 Related match Indicative (40%) The periodic environmental-compliance reporting expected by Principle 8 overlaps with Effinature's worksite monitoring and ecological assessments (estimate of biodiversity investments, end-of-operation assessment), without a contractual financing covenant.
EP4 EP-P9 Close match Medium (60%) Principle 9's independent monitoring and long-term reporting correspond to Effinature's site visits by the ecologist and documented worksite monitoring.
ISO 17620 7.2.2 Narrow match Indicative (55%) Worksite monitoring (Avoid-Reduce-Offset) controls the application of impact-reduction measures.
ISO 17620 8.5 Close match Medium (68%) Worksite monitoring continuously documents the implementation of the measures.
LEED AÉS Préalable : Prévention de la pollution pendant la construction Related match Indicative (55%) The implementation and control of the plan during the works correspond to Effinature's worksite monitoring.
SITES Construction P7.1 Related match Indicative (55%) Verification of worksite practices = worksite monitoring.
LEED-ND SS-P1 Related match Indicative (40%) Worksite monitoring (EFF-C-114) - LEED requires a pollution-control plan during the works phase.
ARB IdF IND-07 Related match Low Worksite monitoring by the ecologist verifies the implementation of protection measures.