Ce site utilise des cookies strictement nécessaires à son fonctionnement et des cookies de mesure d'audience (Matomo, hébergé en France). Aucune donnée n'est transmise à des tiers.

EFF-C-124 : Effinature ecological assessment: End of operation

Effinature criterion · theme: Governance and steering

The Effinature criterion “Effinature ecological assessment: End of operation” (EFF-C-124) belongs to the Governance and steering theme and applies to the EVO/HOR/NCO reference framework(s). It maps to 46 international provision(s), including strong matches with TNFD (Metrics & targets A), TNFD (Metrics & targets A), TNFD (Metrics & targets A).

Governance and steering Bilan écologique Effinature Level : exigence EVO HOR NCO

International correspondences (46)

Framework Provision Relation Confidence Rationale
ESRS E4 E4-1 Related match Indicative (45%) The end-of-operation ecological assessment reports on the integration of biodiversity into the running of the project, without covering the resilience of the corporate strategy.
ESRS E4 E4-6 Related match Indicative (35%) The end-of-operation ecological assessment can be related to the financial effects, but remains focused on the ecological result.
CSRD ESRS-E4-1 Broad match Medium Effinature's end-of-operation ecological assessment summarises the integration of biodiversity into the project, partially feeding E4-1 at operation level.
TNFD Metrics & targets A Close match Medium The Effinature ecological assessment and updated indices (IVE, ITCE, CBSh) are the nature-impact monitoring metrics, aligned with Metrics & targets A.
TNFD Metrics & targets A Close match Medium The Effinature ecological assessment and updated indices (IVE, ITCE, CBSh) are the nature-impact monitoring metrics, aligned with Metrics & targets A.
TNFD Metrics & targets A Close match Medium The Effinature ecological assessment and updated indices (IVE, ITCE, CBSh) are the nature-impact monitoring metrics, aligned with Metrics & targets A.
TNFD Metrics & targets B Close match Medium The determination of ecological indices (IVS) and the ecological assessment quantify impacts on nature, aligned with Metrics & targets B.
TNFD Metrics & targets B Close match Medium The determination of ecological indices (IVS) and the ecological assessment quantify impacts on nature, aligned with Metrics & targets B.
TNFD Metrics & targets B Close match Medium The determination of ecological indices (IVS) and the ecological assessment quantify impacts on nature, aligned with Metrics & targets B.
TNFD C5.0 Close match Medium The ecological assessment and flora/fauna monitoring assess ecosystem condition and species trends, aligned with the state-of-nature indicator C5.0.
TNFD C5.0 Close match Medium The ecological assessment and flora/fauna monitoring assess ecosystem condition and species trends, aligned with the state-of-nature indicator C5.0.
TNFD C5.0 Close match Medium The ecological assessment and flora/fauna monitoring assess ecosystem condition and species trends, aligned with the state-of-nature indicator C5.0.
SBTN S1b-R21 Broad match Low The initial flora/fauna states characterise, through field surveys, the site's current state of nature, the same object as SBTN's State of Nature; SBTN relies on global datasets rather than project surveys, hence a strong but not identical correspondence.
SBTN S1b-R24 Related match Low The ecological assessment and impact assessment cross, at site level, the state of nature (flora/fauna) and impacts/pressures, which overlaps with the SBTN principle of linking pressure and SoN by location; SBTN structures these data by activity-location pair at the value-chain scale.
Taxonomie UE MONITORING-PLAN Close match High Effinature's end-of-operation ecological assessment, the updating of indices (ITCE/IVE) and management plans ensure the monitoring and maintenance of measures over time.
SFDR ART-4-PAI Related match Indicative (40%) Effinature's end-of-operation ecological assessment reports on biodiversity impacts and actions, echoing the PAI declaration.
ISO 17298 8.3 Related match Medium The external communication of results and ISO reporting overlap with Effinature's end-of-operation ecological assessment, a medium for valorisation and accountability.
ISO 17298 9.3 Close match High The analysis and evaluation of ISO indicator results correspond to Effinature's end-of-operation ecological assessment, which evaluates the effectiveness of the actions.
CDP 10.4 (Bio) Close match Medium Effinature's end-of-operation ecological assessment is the summary indicator of biodiversity performance.
CDP 10.5 (Bio) Related match Low The final ecological assessment reports on the performance achieved, but without a quantified target set beforehand in the CDP sense.
GRESB GRESB-BI1-EXTREV Close match Medium (60%) External review/verification of biodiversity data; Effinature end-of-operation ecological assessment is the third-party ecological verification/audit.
GBF Target 14 Close match High The initial states, environmental impact assessments, prefectural orders, environmental specifications (CPAUPE) and ecological assessments formally integrate biodiversity into the project's planning and impact assessment.
GBF Target 15 Related match Medium The end-of-operation ecological assessment and the estimate of biodiversity investments provide transparent reporting of the operation's impacts and biodiversity efforts, consistent with the monitoring and communication obligation on companies.
GBF Target 21 Narrow match Medium Team training, user awareness-raising, professional skills and ecological monitoring/indices strengthen communication, education, monitoring and knowledge management on biodiversity at the project level.
NRL Art. 1 Broad match Medium These requirements (needs assessment, characterisation of habitats and continuities, set-aside and structured biodiversity area, final ecological assessment) are the operational translation, at the project scale, of the framework objective of durably re-establishing biodiversity and restoring degraded ecosystems.
NRL Art. 20 Narrow match Medium Updates of ecological indices (CBSh, IVE, ITCE) and the end-of-operation ecological assessment ensure the measured and periodic monitoring of the project's ecological evolution, echoing the monitoring obligation.
SNB 2030 SNB-M16 Close match Medium The end-of-operation ecological assessment measures and reports on biodiversity impacts and actions.
Code env. L163-1-compensation Narrow match Indicative (50%) The end-of-operation ecological assessment verifies the achievement of the targeted ecological result (no net loss).
Doctrine ERC ERC-P10 Close match High Effinature's end-of-operation ecological assessment constitutes the final effectiveness assessment, in the sense of Avoid-Reduce-Offset monitoring.
UICN SfN Critère 7 Related match Medium The end-of-operation ecological assessment capitalises on the monitoring lessons, supporting adaptive management.
ÉcoQuartier Engagement 20 Related match Low End-of-operation ecological assessment: joins the logic of evaluating biodiversity results (also linked to commitment 5).
BNG BNG-01 Related match Indicative (45%) Effinature sets no quantitative +10% threshold, but its ecological-gain indices (ITCE, IVS/IVE, CBSh) and the ecological assessment pursue the same objective of a measurable net biodiversity improvement between the initial state and the delivered/managed state.
BNG BNG-09 Related match Indicative (35%) The Biodiversity Gain Plan submitted to the planning authority is a regulatory governance deliverable specific to the English regime; in Effinature, it is marginally close to the management plans (plant heritage, fauna) and the ecological assessment that formalise the biodiversity strategy, without a submission procedure to an LPA.
Crédits biodiv BC-P08 Close match High (80%) The end-of-operation ecological assessment is the project's summary third-party verification.
Crédits biodiv BC-P17 Close match High (80%) The end-of-operation ecological assessment documents and makes the project traceable.
ESS6 ESS6-§12 Close match Medium (65%) Risk management according to the mitigation hierarchy and ESS6's adaptive approach are found in Effinature's worksite monitoring, prevention measures and preservation programme.
EP4 EP-P8 Related match Indicative (40%) The periodic environmental-compliance reporting expected by Principle 8 overlaps with Effinature's worksite monitoring and ecological assessments (estimate of biodiversity investments, end-of-operation assessment), without a contractual financing covenant.
EP4 EP-P10 Related match Indicative (40%) Principle 10's transparency and publication of an environmental assessment summary overlap with Effinature's end-of-operation ecological assessment and estimate of biodiversity investments; data-sharing to GBIF remains an upstream reporting practice not structured by Effinature.
Green Mark / CBI SI-17 Related match Low The end-of-operation ecological assessment documents the implementation of a biodiversity strategy.
Green Mark / CBI SI-18 Close match Medium Effinature's end-of-operation ecological assessment corresponds to the natural-capital assessment of indicator 18.
ISO 17620 5.1 Broad match Medium (72%) Effinature's end-of-operation ecological assessment formalises the achievement of a net biodiversity gain at the operation scale.
ISO 17620 7.3.11 Broad match Indicative (50%) The end-of-operation ecological assessment verifies the priority achievement of biodiversity objectives.
ISO 17620 9.3 Broad match Indicative (50%) The end-of-operation ecological assessment consolidates the monitoring records.
ISO 17620 9.4 Close match Medium (72%) Effinature's end-of-operation ecological assessment constitutes the final biodiversity-results report.
BREEAM LE LE05 Close match Medium (70%) Effinature's end-of-operation ecological assessment provides the reporting/KPI of the LEMP.
SITES Education C9.3 Related match Indicative (50%) End-of-operation performance reporting = Effinature ecological assessment.

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0