Effinature × Code env.

French Environmental Code (protected species, environmental assessment)

Effinature implements 19 objective(s) of French Environmental Code (protected species, environmental assessment).

Effinature turns Code env. into project-level action

Effinature implements, at project level, 19 objectives of Code env..

Policies & regulation: Effinature aligns Regulation FR État Official source ↗

Effinature implements 19 objective(s) of French Environmental Code (protected species, environmental assessment)

Detailed correspondences (72)

Framework provision Effinature criterion Relation Confidence Rationale
L411-1
Prohibition of destruction, alteration or degradation of protected species and their habitats (breeding sites and resting areas)
EFF-C-108
Fauna preservation
Close match Medium (70%) The preservation of fauna aims to avoid harm to specimens and their habitats, the direct object of the L411-1 prohibition.
L411-1
Prohibition of destruction, alteration or degradation of protected species and their habitats (breeding sites and resting areas)
EFF-C-100
Preservation of the initial plant heritage
Close match Medium (65%) The preservation of the initial plant heritage protects protected-flora specimens and their stations, corresponding to the prohibition of harm.
L411-1
Prohibition of destruction, alteration or degradation of protected species and their habitats (breeding sites and resting areas)
EFF-C-075
Sealing of trap cavities
Narrow match Indicative (55%) The sealing of trap cavities avoids the destruction/disturbance of specimens, a component of the prohibition of harm.
L411-1
Prohibition of destruction, alteration or degradation of protected species and their habitats (breeding sites and resting areas)
EFF-C-109
Preventive measures
Narrow match Indicative (55%) Fauna prevention measures limit the destruction and intentional disturbance of protected specimens.
L411-1
Prohibition of destruction, alteration or degradation of protected species and their habitats (breeding sites and resting areas)
EFF-C-072
Fauna analysis
Narrow match Indicative (50%) Fauna analysis identifies the protected species present, a prerequisite for applying the prohibition of harm.
L411-1
Prohibition of destruction, alteration or degradation of protected species and their habitats (breeding sites and resting areas)
EFF-C-062
Areas set aside for biodiversity
Narrow match Indicative (50%) Set-aside areas for biodiversity remove habitats from harm, consistent with the protection of species' habitats.
L411-2-4
Derogation regime for species protection (absence of alternative solution, RIIPM, maintenance of favourable conservation status)
EFF-C-079
Prefectural order of the environmental authority: fauna component
Close match Medium (70%) The prefectural order of the environmental authority, fauna component, materialises the protected-species derogation obtained by the project.
L411-2-4
Derogation regime for species protection (absence of alternative solution, RIIPM, maintenance of favourable conservation status)
EFF-C-071
Prefectural order of the environmental authority: flora component
Close match Medium (70%) The prefectural order of the environmental authority, flora component, materialises the protected-species derogation for flora.
L411-2-4
Derogation regime for species protection (absence of alternative solution, RIIPM, maintenance of favourable conservation status)
EFF-C-074
Fauna preservation programme
Narrow match Indicative (50%) The fauna preservation programme operationally translates the avoidance measures conditioning the granting of the derogation.
R411-6-a-14
Content of the protected-species derogation file: qualification of those intervening, intervention protocol, Avoid-Reduce-Offset measures and monitoring/reporting arrangements
EFF-C-012
Site visits by the ecologist
Close match Medium (65%) Worksite visits by the ecologist correspond to the intervention protocol supervised by a qualified professional required in the derogation file.
R411-6-a-14
Content of the protected-species derogation file: qualification of those intervening, intervention protocol, Avoid-Reduce-Offset measures and monitoring/reporting arrangements
EFF-C-120
Training and accreditation of the Biodiversity Partner
Narrow match Indicative (55%) The training and accreditation of the Biodiversity Partner attest to the qualification of the persons intervening, required by the derogation file.
R411-6-a-14
Content of the protected-species derogation file: qualification of those intervening, intervention protocol, Avoid-Reduce-Offset measures and monitoring/reporting arrangements
EFF-C-112
Worksite incident reports: fauna component
Narrow match Indicative (55%) Worksite incident reports, fauna component, correspond to the reporting arrangements for interventions in the protocol.
R411-6-a-14
Content of the protected-species derogation file: qualification of those intervening, intervention protocol, Avoid-Reduce-Offset measures and monitoring/reporting arrangements
EFF-C-044
Fauna monitoring
Narrow match Indicative (50%) Fauna monitoring provides the arrangements for recording data and post-intervention monitoring.
L122-1
Environmental assessment of projects: carrying out an impact study of environmental effects submitted to the environmental authority
EFF-C-070
Environmental impact assessment
Close match Medium (70%) Effinature's environmental impact assessment corresponds to the impact-study report required by the environmental assessment.
L122-1
Environmental assessment of projects: carrying out an impact study of environmental effects submitted to the environmental authority
EFF-C-071
Prefectural order of the environmental authority: flora component
Narrow match Indicative (50%) The prefectural order of the environmental authority, flora component, is a deliverable of the environmental assessment procedure.
L122-1
Environmental assessment of projects: carrying out an impact study of environmental effects submitted to the environmental authority
EFF-C-079
Prefectural order of the environmental authority: fauna component
Narrow match Indicative (50%) The prefectural order of the environmental authority, fauna component, is a deliverable of the environmental assessment procedure.
L122-1-ERC
Avoid-Reduce-Offset sequence and authorisation prescriptions: measures to avoid, reduce then offset significant negative impacts
EFF-C-010
Needs assessment
Narrow match Indicative (55%) The needs assessment conditions avoidance at source, the first step of the Avoid-Reduce-Offset sequence.
L122-1-ERC
Avoid-Reduce-Offset sequence and authorisation prescriptions: measures to avoid, reduce then offset significant negative impacts
EFF-C-062
Areas set aside for biodiversity
Narrow match Indicative (55%) Set-aside areas for biodiversity make concrete the avoidance of impacts on habitats.
L122-1-ERC
Avoid-Reduce-Offset sequence and authorisation prescriptions: measures to avoid, reduce then offset significant negative impacts
EFF-C-100
Preservation of the initial plant heritage
Narrow match Indicative (55%) The preservation of the initial plant heritage is an avoidance/reduction measure for harm to flora.
L122-1-ERC
Avoid-Reduce-Offset sequence and authorisation prescriptions: measures to avoid, reduce then offset significant negative impacts
EFF-C-108
Fauna preservation
Narrow match Indicative (55%) The preservation of fauna brings together avoidance and reduction measures for impacts on species.
L122-1-ERC
Avoid-Reduce-Offset sequence and authorisation prescriptions: measures to avoid, reduce then offset significant negative impacts
EFF-C-074
Fauna preservation programme
Narrow match Indicative (50%) The fauna preservation programme structures the reduction and offset measures.
L122-1-ERC
Avoid-Reduce-Offset sequence and authorisation prescriptions: measures to avoid, reduce then offset significant negative impacts
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
Related match Indicative (45%) The implementation of a Structured Biodiversity Area (EBS) can serve as an offset or restoration measure.
R122-5-etat-initial
Content of the impact study: description of the current state of the environment (initial state), notably fauna, flora, habitats and ecological continuities
EFF-C-073
Initial fauna state
Close match Medium (70%) Effinature's initial fauna state corresponds exactly to the description of the current state of fauna required in the impact study.
R122-5-etat-initial
Content of the impact study: description of the current state of the environment (initial state), notably fauna, flora, habitats and ecological continuities
EFF-C-060
Initial flora state
Close match Medium (70%) The initial flora state corresponds to the description of the current state of flora in the impact study.
R122-5-etat-initial
Content of the impact study: description of the current state of the environment (initial state), notably fauna, flora, habitats and ecological continuities
EFF-C-072
Fauna analysis
Close match Medium (65%) Fauna analysis constitutes the inventory of the initial fauna state.
R122-5-etat-initial
Content of the impact study: description of the current state of the environment (initial state), notably fauna, flora, habitats and ecological continuities
EFF-C-059
Flora analysis
Close match Medium (65%) Flora analysis constitutes the inventory of the initial flora state.
R122-5-etat-initial
Content of the impact study: description of the current state of the environment (initial state), notably fauna, flora, habitats and ecological continuities
EFF-C-061
Ecological continuities and habitat characterisation
Narrow match Indicative (55%) The characterisation of ecological continuities and habitats documents the initial state of natural habitats.
R122-5-etat-initial
Content of the impact study: description of the current state of the environment (initial state), notably fauna, flora, habitats and ecological continuities
EFF-C-019
Assessment of ecological continuities and habitat characterisation
Narrow match Indicative (55%) The assessment of ecological continuities and the characterisation of habitats inform the initial state of habitats.
R122-5-etat-initial
Content of the impact study: description of the current state of the environment (initial state), notably fauna, flora, habitats and ecological continuities
EFF-C-052
Initial soil state
Narrow match Indicative (50%) The initial soil state completes the description of the current state of the environment (soil factor).
R122-5-incidences
Content of the impact study: description of the project's significant impacts on the environment (direct, indirect, cumulative effects)
EFF-C-070
Environmental impact assessment
Close match Medium (70%) The environmental impact assessment describes the project's significant impacts, at the heart of this requirement.
R122-5-incidences
Content of the impact study: description of the project's significant impacts on the environment (direct, indirect, cumulative effects)
EFF-C-080
Initial state of pollution
Narrow match Indicative (50%) The initial state of pollution documents a category of potential impacts of the project.
R122-5-mesures
Content of the impact study: description of the Avoid-Reduce-Offset measures, estimate of expenditure and account of expected effects
EFF-C-074
Fauna preservation programme
Close match Medium (65%) The fauna preservation programme describes the fauna Avoid-Reduce-Offset measures expected in the impact study.
R122-5-mesures
Content of the impact study: description of the Avoid-Reduce-Offset measures, estimate of expenditure and account of expected effects
EFF-C-100
Preservation of the initial plant heritage
Narrow match Indicative (55%) The preservation of the initial plant heritage is an avoidance measure described under the Avoid-Reduce-Offset measures.
R122-5-mesures
Content of the impact study: description of the Avoid-Reduce-Offset measures, estimate of expenditure and account of expected effects
EFF-C-123
Estimate of investments in favour of biodiversity
Narrow match Indicative (55%) The estimate of investments in favour of biodiversity corresponds to the estimate of expenditure on Avoid-Reduce-Offset measures.
R122-5-mesures
Content of the impact study: description of the Avoid-Reduce-Offset measures, estimate of expenditure and account of expected effects
EFF-C-076
Evidence in favour of biodiversity
Related match Indicative (40%) Biodiversity-friendly features (shelters, devices) constitute concrete reduction/offset measures.
R122-5-suivi
Content of the impact study: arrangements for monitoring the avoidance, reduction and offset measures and their effects
EFF-C-114
Worksite monitoring
Close match Medium (65%) Worksite monitoring corresponds to the arrangements for monitoring the implementation of Avoid-Reduce-Offset measures.
R122-5-suivi
Content of the impact study: arrangements for monitoring the avoidance, reduction and offset measures and their effects
EFF-C-044
Fauna monitoring
Close match Medium (60%) Fauna monitoring is an arrangement for monitoring the effects of Avoid-Reduce-Offset measures on species.
R122-5-suivi
Content of the impact study: arrangements for monitoring the avoidance, reduction and offset measures and their effects
EFF-C-037
Flora monitoring
Narrow match Indicative (55%) Flora monitoring documents the effects of Avoid-Reduce-Offset measures on the flora compartment.
R122-5-suivi
Content of the impact study: arrangements for monitoring the avoidance, reduction and offset measures and their effects
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
Narrow match Indicative (55%) The update of the ITCE measures over time the effect of measures on ecological coherence.
R122-5-suivi
Content of the impact study: arrangements for monitoring the avoidance, reduction and offset measures and their effects
EFF-C-036
Update of the Ecological Value Index (IVE management)
Narrow match Indicative (50%) The update of the Ecological Value Index tracks the evolution of the ecological state after measures.
L411-5-6-EEE
Prevention of the introduction and propagation of invasive exotic species (prohibition of introduction into the natural environment)
EFF-C-102
Discovery of invasive alien plant species (EVEE) during works
Close match Medium (70%) The procedure for the discovery of Invasive Exotic Plant Species during the worksite phase aims to prevent their introduction/propagation, the object of the invasive-species prohibition.
L411-5-6-EEE
Prevention of the introduction and propagation of invasive exotic species (prohibition of introduction into the natural environment)
EFF-C-105
Choice, quality and provenance of plants
Narrow match Indicative (55%) The choice, quality and provenance of plants make it possible to exclude invasive exotic species.
L411-5-6-EEE
Prevention of the introduction and propagation of invasive exotic species (prohibition of introduction into the natural environment)
EFF-C-063
Plant palette
Narrow match Indicative (50%) The plant palette, oriented towards local species, rules out the introduction of invasive exotic species.
L414-4
Natura 2000 impact assessment for any project likely to significantly affect a Natura 2000 site
EFF-C-070
Environmental impact assessment
Narrow match Indicative (55%) The environmental impact assessment covers, where applicable, the assessment of impacts on a Natura 2000 site.
L414-4
Natura 2000 impact assessment for any project likely to significantly affect a Natura 2000 site
EFF-C-061
Ecological continuities and habitat characterisation
Related match Indicative (45%) The characterisation of ecological continuities and habitats sheds light on the connection issues with a Natura 2000 site.
L414-4
Natura 2000 impact assessment for any project likely to significantly affect a Natura 2000 site
EFF-C-019
Assessment of ecological continuities and habitat characterisation
Related match Indicative (40%) The assessment of ecological continuities informs the project's articulation with protected ecological networks.
L341-1-defrichement
Clearing authorisation and forestry offset measures (Forestry Code, in articulation with the environmental assessment)
EFF-C-025
Earthworks / land-clearing operations method
Close match Medium (60%) Effinature's earthworks/land-clearing operations methods frame the act of removing cover targeted by the clearing authorisation.
L341-1-defrichement
Clearing authorisation and forestry offset measures (Forestry Code, in articulation with the environmental assessment)
EFF-C-110
Earthworks / land-clearing operations methods
Close match Medium (60%) The earthworks/land-clearing operations methods correspond to the execution arrangements for land clearing.
L341-1-defrichement
Clearing authorisation and forestry offset measures (Forestry Code, in articulation with the environmental assessment)
EFF-C-100
Preservation of the initial plant heritage
Narrow match Indicative (50%) The preservation of the initial plant heritage limits clearing and steers towards the avoidance of woodland.
L163-1-compensation
Obligation of result for measures offsetting harm to biodiversity (no net loss, effectiveness and durability)
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
Narrow match Indicative (55%) The implementation of a Structured Biodiversity Area (EBS) constitutes a restoration/offset measure aimed at ecological gain.
L163-1-compensation
Obligation of result for measures offsetting harm to biodiversity (no net loss, effectiveness and durability)
EFF-C-074
Fauna preservation programme
Narrow match Indicative (55%) The fauna preservation programme carries measures whose durability and effectiveness are required by the obligation of result.
L163-1-compensation
Obligation of result for measures offsetting harm to biodiversity (no net loss, effectiveness and durability)
EFF-C-124
Effinature ecological assessment: End of operation
Narrow match Indicative (50%) The end-of-operation ecological assessment verifies the achievement of the targeted ecological result (no net loss).
L163-1-compensation
Obligation of result for measures offsetting harm to biodiversity (no net loss, effectiveness and durability)
EFF-C-123
Estimate of investments in favour of biodiversity
Related match Indicative (40%) The estimate of investments in favour of biodiversity supports the durability of the offset measures.
L110-1-eviter
Principle of preventive and corrective action giving priority at source, and non-regression: the Avoid/Reduce/Offset hierarchy
EFF-C-010
Needs assessment
Narrow match Indicative (50%) The needs assessment reflects the priority given to avoidance at source of harm.
L110-1-eviter
Principle of preventive and corrective action giving priority at source, and non-regression: the Avoid/Reduce/Offset hierarchy
EFF-C-062
Areas set aside for biodiversity
Narrow match Indicative (50%) Set-aside areas embody avoidance at source of harm to habitats.
L110-1-eviter
Principle of preventive and corrective action giving priority at source, and non-regression: the Avoid/Reduce/Offset hierarchy
EFF-C-100
Preservation of the initial plant heritage
Narrow match Indicative (50%) The preservation of the initial plant heritage applies the priority given to avoidance at source.
L583-espace-nuit
Prevention of light nuisance and protection of the night sky (light-pollution policing)
EFF-C-081
Reduction of light nuisance
Close match Medium (70%) Effinature's reduction of light nuisance responds directly to the Code's objective of limiting light nuisance.
L583-espace-nuit
Prevention of light nuisance and protection of the night sky (light-pollution policing)
EFF-C-082
Assessment of outdoor-lighting needs
Close match Medium (65%) The assessment of outdoor-lighting needs corresponds to limiting light points at source.
L583-espace-nuit
Prevention of light nuisance and protection of the night sky (light-pollution policing)
EFF-C-002
White infrastructure: control of noise nuisance
Narrow match Indicative (45%) The white framework addresses the control of nuisance; complementing the dark framework, it contributes to the protection of nocturnal environments.
L571-bruit
Combating noise and preventing noise nuisance in the environment
EFF-C-083
Reduction of noise nuisance
Close match Medium (65%) Effinature's reduction of noise nuisance corresponds to the limitation of noise harming the environment.
L571-bruit
Combating noise and preventing noise nuisance in the environment
EFF-C-002
White infrastructure: control of noise nuisance
Narrow match Indicative (50%) The white framework: control of noise nuisance aims to preserve environments from acoustic disturbance.
L214-1-eau
IOTA regime (water law): stormwater management, sealing and preservation of aquatic environments
EFF-C-068
Sustainable stormwater management
Close match Medium (60%) Effinature's sustainable stormwater management overlaps with the framing of discharges and run-off under the IOTA regime.
L214-1-eau
IOTA regime (water law): stormwater management, sealing and preservation of aquatic environments
EFF-C-018
Stormwater management along roads
Narrow match Indicative (50%) The management of stormwater along roads contributes to the control of run-off targeted by the water law.
L214-1-eau
IOTA regime (water law): stormwater management, sealing and preservation of aquatic environments
EFF-C-006
Combating soil sealing and heat islands
Narrow match Indicative (50%) Combating soil sealing reduces the run-off framed by the IOTA regime.
L541-1-dechets
Prevention and management of worksite waste (management hierarchy, traceability)
EFF-C-116
Waste-management programme
Close match Medium (65%) Effinature's waste management programme applies the Code's waste-management hierarchy and traceability.
L541-1-dechets
Prevention and management of worksite waste (management hierarchy, traceability)
EFF-C-015
Waste management plan
Close match Medium (60%) The waste management plan structures the prevention and management of worksite waste.
L541-1-dechets
Prevention and management of worksite waste (management hierarchy, traceability)
EFF-C-117
Waste monitoring
Narrow match Indicative (55%) Waste monitoring ensures the traceability required by the regulations.
L541-1-dechets
Prevention and management of worksite waste (management hierarchy, traceability)
EFF-C-104
Green-waste management
Narrow match Indicative (50%) Green-waste management is a component of the project's waste management.
L110-1-connaissance
Objective of knowledge and monitoring of biodiversity (inventories, indicators, restoration)
EFF-C-072
Fauna analysis
Narrow match Indicative (50%) Fauna analysis contributes to the objective of biodiversity knowledge.
L110-1-connaissance
Objective of knowledge and monitoring of biodiversity (inventories, indicators, restoration)
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
Narrow match Indicative (50%) The update of the ITCE feeds the monitoring and knowledge of ecological coherence.
L110-1-connaissance
Objective of knowledge and monitoring of biodiversity (inventories, indicators, restoration)
EFF-C-007
IVS determination
Narrow match Indicative (45%) The determination of the IVS produces a knowledge indicator of ecological value.
L110-1-connaissance
Objective of knowledge and monitoring of biodiversity (inventories, indicators, restoration)
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
Narrow match Indicative (45%) The implementation of an EBS falls under the restoration/rehabilitation of biodiversity.

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0