EFF-C-010 : Needs assessment

Effinature criterion · theme: Mitigation hierarchy

The Effinature criterion “Needs assessment” (EFF-C-010) belongs to the Mitigation hierarchy theme and applies to the EVO reference framework(s). It maps to 27 international provision(s), including strong matches with GRI 101 (101-2), CDP (10.6 (Bio)), GRESB (GRESB-BI1-REM).

Mitigation hierarchy Réduction des impacts du projet Level : exigence EVO

International correspondences (27)

Framework Provision Relation Confidence Rationale
CSRD ESRS2-IRO-1-E4 Broad match Medium The needs assessment structures the process of identifying issues, consistent with the IRO-1 assessment process.
GRI 101 101-2 Close match High The needs assessment in the Avoid-Reduce-Offset axis (Reduction of project impacts) initiates the Avoid-Reduce approach of the mitigation hierarchy required by 101-2.
SFDR DNSH Related match Indicative (45%) The needs assessment (Avoid-Reduce-Offset approach) translates at project level the DNSH principle of not causing significant harm.
ISO 17298 6.4 Related match Low Identifying biodiversity-related risks and opportunities partially overlaps, at project level, with the assessment of pollution and needs leading to impact reduction.
CDP 10.6 (Bio) Close match Medium The needs assessment (EVO) initiates the mitigation hierarchy through the avoid step.
GRESB GRESB-BI1-REM Close match Medium (60%) Habitat removed captures destruction/displacement of habitat; Effinature needs assessment initiates the avoid-reduce-compensate (ERC) sequence to minimise habitat loss.
GRESB GRESB-NAT-STRAT Related match Indicative (45%) A nature strategy starts from assessing needs/impacts; Effinature needs evaluation initiates the ecological approach.
GBF Target 7 Narrow match Medium The control of worksite and operational pollution, the ban on outdoor plastic, maintenance methods limiting chemical inputs and waste management reduce the risks and impacts of pollution on biodiversity.
NRL Art. 1 Broad match Medium These requirements (needs assessment, characterisation of habitats and continuities, set-aside and structured biodiversity area, final ecological assessment) are the operational translation, at the project scale, of the framework objective of durably re-establishing biodiversity and restoring degraded ecosystems.
Habitats/Oiseaux HAB-Art6.3 Broad match Medium (60%) The upstream needs assessment structures the analysis of the project's potential impacts.
SNB 2030 SNB-M16 Related match Low The needs assessment initiates the identification of biodiversity dependencies and impacts.
Loi biodiv 2016 BIO-01 Broad match High Effinature's needs assessment operationalises the first step of the Avoid-Reduce-Offset sequence (avoid) by questioning the necessity of the developments; the legal sequence is broader (reduce+offset).
Code env. L122-1-ERC Narrow match Indicative (55%) The needs assessment conditions avoidance at source, the first step of the Avoid-Reduce-Offset sequence.
Code env. L110-1-eviter Narrow match Indicative (50%) The needs assessment reflects the priority given to avoidance at source of harm.
Doctrine ERC ERC-P1 Close match High Effinature's needs assessment opens the Avoid-Reduce-Offset sequence upstream, in accordance with the avoid/reduce/offset hierarchical order.
Doctrine ERC ERC-P6 Broad match Medium The upstream needs assessment conditions the appraisal of the project's impacts in the Avoid-Reduce-Offset logic.
Nomenclature ZAN ZAN-SOBRIETE Related match Medium Land sobriety (limiting artificialisation, prioritising urban renewal) joins Effinature's needs-assessment requirement (EFF-C-010) which questions the necessity and footprint of the project upstream. Convergence of intent, distinct mechanisms.
UICN SfN Critère 1 Broad match Low The project's needs assessment is an upstream step which, on the NbS side, corresponds to identifying and documenting the societal challenges to be addressed.
ÉcoQuartier Engagement 20 Related match Medium Avoid-Reduce-Offset approach and environmental authorisation: serves the preservation of ÉcoQuartier natural environments but falls under specific regulatory procedures.
Crédits biodiv BC-P01 Related match Indicative (55%) The needs assessment frames the prior diagnosis.
EP4 EP-P1 Related match Indicative (50%) EP4's upstream categorisation of environmental risks (including biodiversity) is a lender screening; on the Effinature side, the needs assessment and environmental impact assessment play an analogous role of upstream issue identification, for a different purpose.
ISO 17620 6.3 Close match Medium (70%) The needs assessment (Avoid-Reduce-Offset approach) analyses the feasibility of gain measures upstream of the project.
ISO 17620 6.4 Close match Medium (68%) The needs assessment steers the Avoid-Reduce-Offset design choices among the project's options.
ISO 17620 7.2.2 Exact match High (85%) The needs assessment implements the Avoid-Reduce-Offset sequence, equivalent to the mitigation hierarchy.
ISO 17620 7.3.12 Narrow match Indicative (55%) The needs assessment assesses the feasibility of implementing the gain measures.
BREEAM LE LE02 Related match Medium (60%) The needs assessment frames the prior analysis of the site's ecological issues.
BREEAM LE LE03 Close match Medium (75%) The needs assessment (mitigation-hierarchy component) establishes the Avoid-Reduce-Offset sequence at the heart of LE03.

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0