Effinature × BREEAM LE

BREEAM: Land Use & Ecology (LE)

Compared with BREEAM: Land Use & Ecology (LE), Effinature covers the applicable biodiversity criteria as follows: NCO 8/9, EVO 8/9, HOR 7/9, HVE 6/9. The remaining Effinature criteria go beyond this framework's biodiversity scope.

With Effinature certification, you already meet BREEAM LE

The Effinature NCO reference covers 8/9 of BREEAM LE's applicable biodiversity criteria, and documents 40 additional criteria that BREEAM LE does not require.

Comparable frameworks Label / certification International BRE Official source ↗

Inverse coverage per Effinature reference

Share of this framework's applicable biodiversity criteria covered by each Effinature reference. "And more" = Effinature criteria beyond the framework's scope.

NCO
8/9
+40 and more
EVO
8/9
+42 and more
HOR
7/9
+43 and more
HVE
6/9
+19 and more

Detailed correspondences (59)

Framework provision Effinature criterion Relation Confidence Rationale
LE01
Site selection: reuse of previously developed land and remediation of contaminated land (conscious siting)
EFF-C-054
Land use
Close match High (85%) Effinature's land use characterises the prior use (sealed/brownfield) and steers the choice towards already-artificialised land, at the heart of LE01.
LE01
Site selection: reuse of previously developed land and remediation of contaminated land (conscious siting)
EFF-C-052
Initial soil state
Related match Medium (70%) The initial soil state documents the nature/quality of the supporting land, a prerequisite for assessing the reuse of a developed/contaminated site.
LE01
Site selection: reuse of previously developed land and remediation of contaminated land (conscious siting)
EFF-C-080
Initial state of pollution
Related match Medium (70%) The initial state of pollution corresponds to the contamination investigation required to valorise a site to be remediated under LE01.
LE01
Site selection: reuse of previously developed land and remediation of contaminated land (conscious siting)
EFF-C-115
Pollution treatment and risk prevention
Related match Medium (65%) Pollution treatment and risk prevention overlaps with the remediation of a contaminated site rewarded by LE01.
LE01
Site selection: reuse of previously developed land and remediation of contaminated land (conscious siting)
EFF-C-028
Soil preservation
Related match Medium (60%) Soil preservation reflects the intention to reuse/valorise an existing support rather than artificialise virgin land.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-072
Fauna analysis
Close match High (85%) Fauna analysis (initial state by ecologist) establishes the site's ecological value required by LE02.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-059
Flora analysis
Close match High (85%) Flora analysis establishes the plant ecological value, a direct component of the LE02 assessment.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-061
Ecological continuities and habitat characterisation
Close match High (80%) Ecological continuities and habitat characterisation = habitat mapping and zone of influence expected under LE02.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-073
Initial fauna state
Close match High (80%) The initial fauna state constitutes the field survey required by the qualified ecologist.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-060
Initial flora state
Close match High (80%) The initial flora state is LE02's baseline flora survey.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-019
Assessment of ecological continuities and habitat characterisation
Close match High (80%) The assessment of ecological continuities and habitat characterisation (HOR) corresponds to the identification of ecological issues/opportunities.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-070
Environmental impact assessment
Related match Medium (70%) The environmental impact assessment overlaps with the analysis of ecological risks and opportunities (GN34).
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-120
Training and accreditation of the Biodiversity Partner
Related match Medium (70%) The training and accreditation of the Biodiversity Partner correspond to the requirement for a qualified ecologist (SQE) leading the assessment.
LE02
Ecological value of site: assessment of risks & opportunities by a Suitably Qualified Ecologist (baseline survey, zone of influence, protected species)
EFF-C-010
Needs assessment
Related match Medium (60%) The needs assessment frames the prior analysis of the site's ecological issues.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-108
Fauna preservation
Close match High (85%) The preservation of fauna reflects the protection of species/habitats retained during development.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-100
Preservation of the initial plant heritage
Close match High (85%) The preservation of the initial plant heritage corresponds to the protection of retained ecological features (LE03).
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-010
Needs assessment
Close match Medium (75%) The needs assessment (mitigation-hierarchy component) establishes the Avoid-Reduce-Offset sequence at the heart of LE03.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-101
Site installation plan (PIC): flora component
Close match High (80%) The PIC flora component protects retained vegetation during the works (root zones, marking out).
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-111
Site installation plan (PIC): fauna component
Close match High (80%) The PIC fauna component organises the protection of fauna on the worksite (sensitive construction practices).
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-051
Low-nuisance worksite
Close match Medium (75%) The low-nuisance worksite implements construction practices protecting the site's ecology.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-014
Derogation for works during a sensitive period
Related match Medium (70%) The derogation for works during a sensitive period protects nesting fauna during critical phases.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-013
Limiting the crushing of microfauna
Related match Medium (65%) Limiting the crushing of microfauna falls under measures to minimise worksite impacts.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-109
Preventive measures
Related match Medium (65%) Prevention measures reduce harm to fauna, consistent with the mitigation hierarchy.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-025
Earthworks / land-clearing operations method
Related match Medium (60%) The earthworks/land-clearing operations method frames the minimisation of impacts on habitats.
LE03
Managing negative impacts on ecology: mitigation hierarchy, protection of retained features during construction
EFF-C-102
Discovery of invasive alien plant species (EVEE) during works
Related match Medium (60%) The management of EVEE during the works phase avoids ecological degradation by invasive species.
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-063
Plant palette
Close match High (85%) The plant palette (local/native) is the direct lever of ecological enrichment rewarded by LE04.
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
Close match High (85%) The implementation of a Structured Biodiversity Area creates new habitats, at the heart of LE04's enhancement.
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-062
Areas set aside for biodiversity
Close match High (80%) Set-aside areas for biodiversity increase the site's ecological value.
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-066
Building greening
Close match Medium (75%) Building greening adds habitat areas, contributing to the ecological gain.
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-076
Evidence in favour of biodiversity
Close match Medium (75%) Biodiversity-friendly features (shelters, nest boxes) constitute ecological-enhancement measures.
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-064
Choice of the plant palette
Related match Medium (70%) The choice of the plant palette steers towards biodiversity-favourable species (enhancement).
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-007
IVS determination
Related match Medium (65%) The determination of the IVS measures the plant value underpinning the targeted ecological improvement.
LE04
Ecological change and enhancement: increase in ecological value (native planting, habitat creation, biodiversity net gain)
EFF-C-021
Greening and buildings
Related match Medium (65%) Greening and buildings increase the ecologically functional area.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-065
Plant-heritage management plan
Close match High (85%) The plant-heritage management plan is the direct equivalent of the Landscape & Ecology Management Plan (LEMP).
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-069
Sustainable management of plant heritage
Close match High (80%) The sustainable management of plant heritage formalises the long-term ecological maintenance required by LE05.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-043
Overall intervention schedule
Close match Medium (75%) The overall intervention schedule structures the roles and calendar of management, a component of the LEMP.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-044
Fauna monitoring
Close match Medium (75%) Fauna monitoring provides the monitoring/KPI of long-term ecological management.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-037
Flora monitoring
Close match Medium (75%) Flora monitoring feeds the monitoring of ecological state over time.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-031
Management of plant heritage
Close match Medium (70%) The management of plant heritage (HVE) operationalises the ecological management plan.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-124
Effinature ecological assessment: End of operation
Close match Medium (70%) Effinature's end-of-operation ecological assessment provides the reporting/KPI of the LEMP.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-035
Specific management of the Structured Biodiversity Area (EBS)
Related match Medium (65%) The specific management of the EBS falls under the long-term ecological management plan.
LE05
Long term ecology management and maintenance: Landscape & Ecology Management Plan (LEMP), roles, KPIs
EFF-C-033
Mowing of green spaces
Related match Medium (60%) The mowing of green spaces is an ecological maintenance prescription of the LEMP.
LE06
Change in ecological value: quantified calculation (GN36) of biodiversity value pre/post development
EFF-C-036
Update of the Ecological Value Index (IVE management)
Close match High (80%) The update of the IVE (Ecological Value Index) quantifies the evolution of ecological value, comparable to GN36.
LE06
Change in ecological value: quantified calculation (GN36) of biodiversity value pre/post development
EFF-C-099
Update of the CBSh (harmonised Biotope Area Factor)
Close match Medium (75%) The update of the CBSh measures the evolution of the site's biotope potential (a quantitative proxy for ecological value).
LE06
Change in ecological value: quantified calculation (GN36) of biodiversity value pre/post development
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
Close match Medium (75%) The update of the ITCE quantifies the evolution of ecological coherence pre/post project.
LE06
Change in ecological value: quantified calculation (GN36) of biodiversity value pre/post development
EFF-C-004
Harmonised Biotope Area Factor (CBSh)
Related match Medium (65%) The CBSh (initial state) provides the baseline value for measuring ecological change.
LE06
Change in ecological value: quantified calculation (GN36) of biodiversity value pre/post development
EFF-C-024
Update of the district CBSh (harmonised Biotope Area Factor: district)
Related match Medium (60%) The update of the district CBSh extends the measurement of change to the district scale.
LE06
Change in ecological value: quantified calculation (GN36) of biodiversity value pre/post development
EFF-C-123
Estimate of investments in favour of biodiversity
Related match Indicative (55%) The estimate of investments in favour of biodiversity accompanies the quantification of the ecological gain.
POL04
Reduction of night-time light pollution: external lighting strategy limiting obtrusive/upward light (CIE 150-2003 / ILP GN01), switch-off controls
EFF-C-081
Reduction of light nuisance
Close match High (85%) Reducing light nuisance corresponds directly to the objective of POL04 (limiting intrusive/upward light).
POL04
Reduction of night-time light pollution: external lighting strategy limiting obtrusive/upward light (CIE 150-2003 / ILP GN01), switch-off controls
EFF-C-082
Assessment of outdoor-lighting needs
Close match High (80%) The assessment of outdoor-lighting needs = the design of a controlled lighting strategy (POL04).
POL04
Reduction of night-time light pollution: external lighting strategy limiting obtrusive/upward light (CIE 150-2003 / ILP GN01), switch-off controls
EFF-C-048
Outdoor lighting
Close match Medium (75%) Outdoor lighting (HVE) frames the operation of lighting in accordance with light-pollution reduction requirements.
POL03
Flood risk management and reducing surface water run-off: SuDS, attenuation, no increase in post-development run-off
EFF-C-068
Sustainable stormwater management
Close match High (85%) Sustainable stormwater management (infiltration, source management) corresponds to the SuDS techniques required by POL03.
POL03
Flood risk management and reducing surface water run-off: SuDS, attenuation, no increase in post-development run-off
EFF-C-018
Stormwater management along roads
Close match Medium (75%) Stormwater management along roads implements SuDS devices (swales) limiting run-off.
POL03
Flood risk management and reducing surface water run-off: SuDS, attenuation, no increase in post-development run-off
EFF-C-067
Water-resource management plan
Related match Medium (70%) The water-resource management plan integrates the control of stormwater run-off.
POL03
Flood risk management and reducing surface water run-off: SuDS, attenuation, no increase in post-development run-off
EFF-C-042
Integrity check of stormwater-harvesting systems
Related match Indicative (55%) The integrity check of stormwater-harvesting systems ensures the durability of SuDS structures.
WAT01
Water consumption: reduction of potable water use (efficient fittings, metering)
EFF-C-038
Reasonable water use
Close match Medium (75%) Reasonable water use aims at reducing consumption, an objective of WAT01.
WAT01
Water consumption: reduction of potable water use (efficient fittings, metering)
EFF-C-039
Water-resource optimisation report
Related match Medium (65%) The water-resource optimisation report documents consumption savings.
WAT01
Water consumption: reduction of potable water use (efficient fittings, metering)
EFF-C-040
Watering technique
Related match Medium (60%) The water-saving watering technique reduces green-space water consumption.
WAT01
Water consumption: reduction of potable water use (efficient fittings, metering)
EFF-C-041
Meter readings
Related match Indicative (55%) Meter readings correspond to the metering required for consumption monitoring (WAT01).

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0