Ce site utilise des cookies strictement nécessaires à son fonctionnement et des cookies de mesure d'audience (Matomo, hébergé en France). Aucune donnée n'est transmise à des tiers.

Effinature × LEED-ND

LEED for Neighborhood Development (ND)

Compared with LEED for Neighborhood Development (ND), Effinature covers the applicable biodiversity criteria as follows: NCO 4/23, EVO 5/23, HOR 2/23, HVE 1/23. The remaining Effinature criteria go beyond this framework's biodiversity scope.

With Effinature certification, you already meet LEED-ND

The Effinature EVO reference covers 5/23 of LEED-ND's applicable biodiversity criteria, and documents 0 additional criteria that LEED-ND does not require.

Comparable frameworks Label / certification International BRE / USGBC Official source ↗

Inverse coverage per Effinature reference

Share of this framework's applicable biodiversity criteria covered by each Effinature reference. "And more" = Effinature criteria beyond the framework's scope.

NCO
4/23
EVO
5/23
HOR
2/23
HVE
1/23

Detailed correspondences (68)

Framework provision Effinature criterion Relation Confidence Rationale
SLL-P4
Agricultural Land Conservation
EFF-C-003
Soil quality
Related match Indicative (45%) LEED protects high-quality farmland (valuable soils); Effinature EFF-C-003 targets the site's soil quality. Partial overlap on soil value.
SLL-P4
Agricultural Land Conservation
EFF-C-054
Land use
Related match Indicative (40%) Land use/consumption; LEED avoids the artificialisation of farmland at district scale.
SLL-C2
Brownfield Remediation
EFF-C-003
Soil quality
Related match Indicative (50%) Brownfield Remediation addresses the decontamination of polluted soils, overlapping with the soil-quality requirement (EFF-C-003) for polluted sites.
SLL-C2
Brownfield Remediation
EFF-C-115
Pollution treatment and risk prevention
Related match Indicative (50%) Pollution treatment and risk prevention (EFF-C-115) - LEED targets the remediation of brownfields before development.
SLL-C2
Brownfield Remediation
EFF-C-080
Initial state of pollution
Related match Indicative (40%) Initial state of pollution (EFF-C-080) - LEED remediation relies on a contamination diagnosis (Phase II ESA).
SLL-C4
Steep Slope Protection
EFF-C-006
Combating soil sealing and heat islands
Related match Indicative (40%) Steep Slope Protection limits the artificialisation/erosion of slopes; partial link with the combating of soil sealing (EFF-C-006).
SLL-C4
Steep Slope Protection
EFF-C-028
Soil preservation
Related match Indicative (40%) Soil preservation (EFF-C-028) - LEED protects sloping soils against erosion and degradation.
GIB-C5
Minimized Site Disturbance
EFF-C-028
Soil preservation
Close match Medium (60%) Minimized Site Disturbance preserves the existing soils and vegetation outside the footprint - corresponds to Soil Preservation (EFF-C-028).
GIB-C5
Minimized Site Disturbance
EFF-C-098
Soil preservation
Related match Indicative (50%) Soil preservation during the worksite phase (EFF-C-098) via the limitation of the disturbed footprint.
GIB-C5
Minimized Site Disturbance
EFF-C-100
Preservation of the initial plant heritage
Related match Indicative (55%) Preservation of the initial plant heritage (EFF-C-100) - GIB-C5 protects the existing native vegetation.
GIB-C5
Minimized Site Disturbance
EFF-C-011
Site installation plan (PIC): soil component
Related match Indicative (40%) Worksite installation plan, soil component (EFF-C-011) - LEED delimits the zones not to be disturbed.
SS-P1
Construction Activity Pollution Prevention
EFF-C-011
Site installation plan (PIC): soil component
Related match Indicative (50%) PIC soil component (EFF-C-011) - LEED worksite pollution prevention imposes soil-protection and anti-erosion measures.
SS-P1
Construction Activity Pollution Prevention
EFF-C-051
Low-nuisance worksite
Related match Indicative (50%) Low-nuisance worksite (EFF-C-051) - control of erosion, sedimentation and dust during the worksite.
SS-P1
Construction Activity Pollution Prevention
EFF-C-114
Worksite monitoring
Related match Indicative (40%) Worksite monitoring (EFF-C-114) - LEED requires a pollution-control plan during the works phase.
SS-P1
Construction Activity Pollution Prevention
EFF-C-115
Pollution treatment and risk prevention
Related match Indicative (40%) Pollution treatment and risk prevention (EFF-C-115) during the worksite phase.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-072
Fauna analysis
Related match Indicative (50%) Fauna analysis (EFF-C-072) - the LEED prerequisite requires the conservation of threatened species identified by a biologist.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-074
Fauna preservation programme
Related match Indicative (50%) Fauna preservation programme (EFF-C-074) - avoidance/protection of the habitats of threatened species.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-108
Fauna preservation
Related match Indicative (50%) Preservation of fauna (EFF-C-108) - conservation of imperilled species and ecological communities.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-070
Environmental impact assessment
Related match Indicative (40%) Environmental impact assessment (EFF-C-070) - LEED assesses and avoids impacts on threatened species.
SLL-P2
Imperiled Species and Ecological Communities Conservation
EFF-C-062
Areas set aside for biodiversity
Related match Indicative (45%) Set-aside areas for biodiversity (EFF-C-062) - the LEED prerequisite sets aside the habitats of imperilled species.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-062
Areas set aside for biodiversity
Close match Medium (60%) Site Design for Habitat conserves and sets aside significant habitat via buffer zones - corresponds to the Set-aside Areas (EFF-C-062).
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-019
Assessment of ecological continuities and habitat characterisation
Related match Indicative (45%) Assessment of ecological continuities and characterisation of habitats (EFF-C-019) - LEED has the habitats delimited by a biologist.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-061
Ecological continuities and habitat characterisation
Related match Indicative (45%) Ecological continuities and characterisation of habitats (EFF-C-061) - delimitation of the significant habitat and its buffers.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-074
Fauna preservation programme
Related match Indicative (40%) Fauna preservation programme (EFF-C-074) - site design to conserve the fauna habitat.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-108
Fauna preservation
Related match Indicative (40%) Preservation of fauna (EFF-C-108) via habitat protection in the design.
SLL-C5
Site Design for Habitat or Wetland and Water Body Conservation
EFF-C-100
Preservation of the initial plant heritage
Related match Indicative (40%) Preservation of the initial plant heritage (EFF-C-100) - conservation of native plants.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
Related match Indicative (50%) Implementation of a Structured Biodiversity Area (EFF-C-103) - restoration of native habitats on part of the footprint.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-063
Plant palette
Related match Indicative (50%) Plant palette (EFF-C-063) - LEED restores with native plants only.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-064
Choice of the plant palette
Related match Indicative (50%) Choice of the plant palette (EFF-C-064) - restoration with representative native species.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-020
Spontaneous flora
Related match Indicative (40%) Spontaneous flora (EFF-C-020) - restoration of pre-development plant communities.
SLL-C6
Restoration of Habitat or Wetlands and Water Bodies
EFF-C-105
Choice, quality and provenance of plants
Related match Indicative (40%) Choice, quality and provenance of plants (EFF-C-105) - exclusive use of native plants in restoration.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-065
Plant-heritage management plan
Close match Medium (60%) Plant-heritage management plan (EFF-C-065) - LEED requires a long-term (>=10 years) habitat management plan.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-069
Sustainable management of plant heritage
Related match Indicative (50%) Sustainable management of plant heritage (EFF-C-069) - funded long-term management plan.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-035
Specific management of the Structured Biodiversity Area (EBS)
Related match Indicative (45%) Specific management of the Structured Biodiversity Area (EFF-C-035) - long-term conservation management of the habitats.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-044
Fauna monitoring
Related match Indicative (40%) Fauna monitoring (EFF-C-044) - the LEED plan provides for monitoring/evaluation by a biologist.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-037
Flora monitoring
Related match Indicative (40%) Flora monitoring (EFF-C-037) - ecological monitoring in the long-term management plan.
SLL-C7
Long-Term Conservation Management of Habitat or Wetlands and Water Bodies
EFF-C-123
Estimate of investments in favour of biodiversity
Related match Indicative (40%) Estimate of investments in favour of biodiversity (EFF-C-123) - LEED requires a guaranteed funding source for management.
NPD-C13
Tree-Lined and Shaded Streetscapes
EFF-C-017
Open-ground reservoir for street-alignment trees
Related match Indicative (50%) Open-ground reservoir for alignment trees (EFF-C-017) - LEED plants alignment trees along the streets.
NPD-C13
Tree-Lined and Shaded Streetscapes
EFF-C-031
Management of plant heritage
Related match Indicative (35%) Plant-heritage management (EFF-C-031) - development of a street tree canopy.
SLL-P3
Wetland and Water Body Conservation
EFF-C-068
Sustainable stormwater management
Related match Indicative (40%) Sustainable stormwater management (EFF-C-068) - the conservation of wetlands/water bodies maintains the hydrological functions.
SLL-P3
Wetland and Water Body Conservation
EFF-C-019
Assessment of ecological continuities and habitat characterisation
Related match Indicative (35%) Assessment of continuities and habitats (EFF-C-019) - LEED characterises the functions of wetlands/water bodies (habitat, water quality).
SLL-P3
Wetland and Water Body Conservation
EFF-C-062
Areas set aside for biodiversity
Related match Indicative (40%) Set-aside areas (EFF-C-062) - wetlands and buffers undisturbed and protected for conservation.
SLL-P5
Floodplain Avoidance
EFF-C-068
Sustainable stormwater management
Related match Indicative (35%) Sustainable stormwater management (EFF-C-068) - avoiding floodplains preserves the hydrological and retention functions.
SS-C1
Rainwater Management
EFF-C-068
Sustainable stormwater management
Close match Medium (65%) Rainwater Management through green infrastructure/LID corresponds directly to Sustainable Stormwater Management (EFF-C-068).
SS-C1
Rainwater Management
EFF-C-067
Water-resource management plan
Related match Indicative (45%) Water-resource management plan (EFF-C-067) - stormwater management at source.
SS-C1
Rainwater Management
EFF-C-018
Stormwater management along roads
Related match Indicative (45%) Stormwater management along roads (EFF-C-018) - LEED LID/swales along the spaces.
SS-C1
Rainwater Management
EFF-C-006
Combating soil sealing and heat islands
Related match Indicative (40%) Combating sealing (EFF-C-006) - LEED limits impermeable surfaces and infiltrates at source.
SS-C1
Rainwater Management
EFF-C-042
Integrity check of stormwater-harvesting systems
Related match Indicative (30%) Integrity check of stormwater-harvesting systems (EFF-C-042) - LEED manages water via dedicated structures.
WE-C2
Outdoor Water Use Reduction
EFF-C-038
Reasonable water use
Related match Indicative (50%) Reasoned use of water (EFF-C-038) - Outdoor Water Use Reduction reduces drinking water for watering.
WE-C2
Outdoor Water Use Reduction
EFF-C-040
Watering technique
Related match Indicative (45%) Watering technique (EFF-C-040) - irrigation efficiency and choice of low-water plants.
WE-C2
Outdoor Water Use Reduction
EFF-C-022
Green-space watering technique
Related match Indicative (45%) Green-space watering technique (EFF-C-022) - reduction of outdoor water via efficient irrigation.
WE-C2
Outdoor Water Use Reduction
EFF-C-039
Water-resource optimisation report
Related match Indicative (40%) Water-resource optimisation report (EFF-C-039) - optimisation of green-space water.
WE-P1
Indoor Water Use Reduction
EFF-C-038
Reasonable water use
Related match Indicative (30%) Reasoned use of water (EFF-C-038) - reduction of water consumption (here indoor), partial overlap.
WE-C1
Indoor Water Use Reduction
EFF-C-039
Water-resource optimisation report
Related match Indicative (30%) Water-resource optimisation report (EFF-C-039) - additional reductions in water consumption.
GIB-C9
Wastewater Management
EFF-C-067
Water-resource management plan
Related match Indicative (30%) Water-resource management plan (EFF-C-067) - reuse/treatment of wastewater on site (broad).
SS-C2
Heat Island Reduction
EFF-C-006
Combating soil sealing and heat islands
Close match Medium (60%) Heat Island Reduction corresponds to the Combating of Soil Sealing and Heat Islands (EFF-C-006).
SS-C2
Heat Island Reduction
EFF-C-021
Greening and buildings
Related match Indicative (45%) Greening and buildings (EFF-C-021) - greened roofs/façades to reduce the heat island.
SS-C2
Heat Island Reduction
EFF-C-066
Building greening
Related match Indicative (40%) Building greening (EFF-C-066) - greened roofs counted in the heat-island reduction.
SS-C3
Light Pollution Reduction
EFF-C-081
Reduction of light nuisance
Close match Medium (60%) Light Pollution Reduction corresponds to the Reduction of Light Nuisance (EFF-C-081), protection of nocturnal fauna.
SS-C3
Light Pollution Reduction
EFF-C-082
Assessment of outdoor-lighting needs
Related match Indicative (45%) Assessment of outdoor-lighting needs (EFF-C-082) - LEED limits uplight/trespass by sizing the lighting.
SS-C3
Light Pollution Reduction
EFF-C-048
Outdoor lighting
Related match Indicative (40%) Outdoor lighting (EFF-C-048) - reduction of light pollution.
NPD-C12
Local Food Production
EFF-C-119
Feeding areas
Related match Indicative (50%) Espaces nourriciers (EFF-C-119) - Local Food Production soutient jardins/agriculture urbaine et production alimentaire locale.
NPD-C8
Access to Civic and Public Space
EFF-C-089
Social bond and awareness
Related match Indicative (30%) Social bonding and awareness (EFF-C-089) - access to public spaces/parks fosters social bonding.
NPD-C8
Access to Civic and Public Space
EFF-C-090
Strengthening social bonds
Related match Indicative (30%) Strengthening of social bonding (EFF-C-090) via access to public spaces and parks.
NPD-C11
Community Outreach and Involvement
EFF-C-090
Strengthening social bonds
Related match Indicative (35%) Strengthening of social bonding (EFF-C-090) - consultation and involvement of residents.
NPD-C11
Community Outreach and Involvement
EFF-C-049
Awareness-raising meeting
Related match Indicative (30%) Awareness meeting (EFF-C-049) - community involvement in the design.
GIB-C11
Solid Waste Management
EFF-C-116
Waste-management programme
Related match Indicative (40%) Waste management programme (EFF-C-116) - Solid Waste Management provides for sorting/recycling/composting.
GIB-C11
Solid Waste Management
EFF-C-104
Green-waste management
Related match Indicative (30%) Green-waste management (EFF-C-104) - composting infrastructure provided for by LEED.

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0