Ce site utilise des cookies strictement nécessaires à son fonctionnement et des cookies de mesure d'audience (Matomo, hébergé en France). Aucune donnée n'est transmise à des tiers.

EFF-C-011 : Site installation plan (PIC): soil component

Effinature criterion · theme: Living soils

The Effinature criterion “Site installation plan (PIC): soil component” (EFF-C-011) belongs to the Living soils theme and applies to the EVO/HOR reference framework(s). It maps to 9 international provision(s), including strong matches with ISO 17620 (8.2).

Living soils Préservation du sol vivant Level : exigence EVO HOR

International correspondences (9)

Framework Provision Relation Confidence Rationale
Nomenclature ZAN ZAN-ART-5 Related match Medium Worksite footprints (cat. 5, artificialised) are the object of the worksite installation plan, soil component (EFF-C-011), which aims to preserve the living soil under the works footprint. An operational link, the nomenclature qualifying the state, Effinature prescribing the protection.
ÉcoQuartier Engagement 20 Related match Medium The soil-component PIC (soil preservation during the worksite phase) serves the soil-preservation objective but remains a detailed worksite prescription.
Estidama NS-R2 Related match Low Soil component of the worksite installation plan - soil protection.
ISO 17620 8.2 Close match Medium (70%) The PIC 'soil component' organises the worksite installation to protect the living soil.
LEED AÉS Préalable : Prévention de la pollution pendant la construction Related match Medium (60%) The erosion-control plan overlaps with the worksite installation plan, soil component, which protects the soil during the works.
SITES Pre-Design P2.3 Related match Indicative (55%) Communication of soil-protection zones = PIC soil component.
SITES Construction P7.3 Related match Medium (60%) Restoring soils disturbed during the worksite = PIC soil component.
LEED-ND GIB-C5 Related match Indicative (40%) Worksite installation plan, soil component (EFF-C-011) - LEED delimits the zones not to be disturbed.
LEED-ND SS-P1 Related match Indicative (50%) PIC soil component (EFF-C-011) - LEED worksite pollution prevention imposes soil-protection and anti-erosion measures.

Source & licence

  • Publisher : IRICE (groupe NORMAXIS)
  • Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
  • Dataset version : 9.1
  • Licence : CC BY-ND 4.0