Effinature × Crédits biodiv
Biodiversity credit methodologies (Wallacea, Plan Vivo, Verra)
Effinature provides evidence for 15 requirement(s) of Biodiversity credit methodologies (Wallacea, Plan Vivo, Verra).
Effinature feeds your Crédits biodiv disclosure
A single field certification, third-party-verified under ISO/IEC 17065, provides the evidence for 15 Crédits biodiv requirements.
Effinature provides evidence for 15 requirement(s) of Biodiversity credit methodologies (Wallacea, Plan Vivo, Verra)
Detailed correspondences (56)
| Framework provision | Effinature criterion | Relation | Confidence | Rationale |
|---|---|---|---|---|
| BC-P01 Initial ecological baseline (reference state before project) |
EFF-C-052
Initial soil state
|
Close match | High (90%) | The initial soil state constitutes a component of the ecological baseline. |
| BC-P01 Initial ecological baseline (reference state before project) |
EFF-C-060
Initial flora state
|
Close match | High (90%) | Initial flora state = flora baseline before project. |
| BC-P01 Initial ecological baseline (reference state before project) |
EFF-C-073
Initial fauna state
|
Close match | High (90%) | Initial fauna state = fauna baseline before project. |
| BC-P01 Initial ecological baseline (reference state before project) |
EFF-C-019
Assessment of ecological continuities and habitat characterisation
|
Close match | High (85%) | The assessment of continuities and characterisation of habitats documents the starting ecological state. |
| BC-P01 Initial ecological baseline (reference state before project) |
EFF-C-080
Initial state of pollution
|
Related match | Medium (60%) | The initial state of pollution completes the site's reference diagnosis. |
| BC-P01 Initial ecological baseline (reference state before project) |
EFF-C-010
Needs assessment
|
Related match | Indicative (55%) | The needs assessment frames the prior diagnosis. |
| BC-P02 Reference / control site to isolate the project's effect |
EFF-C-061
Ecological continuities and habitat characterisation
|
Broad match | Indicative (50%) | The characterisation of continuities/habitats offers an ecological comparison framework, without a dedicated control site. |
| BC-P02 Reference / control site to isolate the project's effect |
EFF-C-026
Update of the district Ecological Coherence Indicator (ITCE district)
|
Related match | Indicative (45%) | The district ecological-coherence baseline index serves as a territorial reference point. |
| BC-P03 Additionality (gain beyond the reference scenario) |
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
|
Broad match | Indicative (55%) | The update of the ITCE measures the ecological gain relative to the baseline state, close to the additionality logic. |
| BC-P03 Additionality (gain beyond the reference scenario) |
EFF-C-099
Update of the CBSh (harmonised Biotope Area Factor)
|
Broad match | Indicative (50%) | The update of the CBSh objectivises the biotope gain brought by the project. |
| BC-P03 Additionality (gain beyond the reference scenario) |
EFF-C-036
Update of the Ecological Value Index (IVE management)
|
Related match | Indicative (45%) | The update of the IVE gestion reflects an ecological added value attributable to the project. |
| BC-P04 Basket of biodiversity metrics (≥5 multi-taxa metrics) |
EFF-C-007
IVS determination
|
Close match | Medium (75%) | The IVS is an ecological indicator in the basket of monitored metrics. |
| BC-P04 Basket of biodiversity metrics (≥5 multi-taxa metrics) |
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
|
Close match | Medium (75%) | The ITCE is a multi-component ecological-coherence metric. |
| BC-P04 Basket of biodiversity metrics (≥5 multi-taxa metrics) |
EFF-C-036
Update of the Ecological Value Index (IVE management)
|
Close match | Medium (75%) | The IVE gestion aggregates several ecological-value parameters. |
| BC-P04 Basket of biodiversity metrics (≥5 multi-taxa metrics) |
EFF-C-037
Flora monitoring
|
Close match | Medium (70%) | Flora monitoring provides metrics of plant richness/diversity. |
| BC-P04 Basket of biodiversity metrics (≥5 multi-taxa metrics) |
EFF-C-044
Fauna monitoring
|
Close match | Medium (70%) | Fauna monitoring provides the basket's fauna metrics. |
| BC-P04 Basket of biodiversity metrics (≥5 multi-taxa metrics) |
EFF-C-030
Methodology for monitoring soil ecological quality
|
Related match | Indicative (55%) | The monitoring of soil ecological quality adds an edaphic metric. |
| BC-P05 Quantification of the uplift (% variation per hectare) |
EFF-C-099
Update of the CBSh (harmonised Biotope Area Factor)
|
Close match | High (80%) | The CBSh measures the share of eco-developed surface per unit of area, updated to objectivise the gain. |
| BC-P05 Quantification of the uplift (% variation per hectare) |
EFF-C-024
Update of the district CBSh (harmonised Biotope Area Factor: district)
|
Close match | Medium (70%) | The update of the District CBSh extends the measurement of the gain to the district scale. |
| BC-P05 Quantification of the uplift (% variation per hectare) |
EFF-C-001
CBS (Biotope Area Factor) determination tool
|
Related match | Indicative (55%) | The CBS determination tool provides the basic surface metric of the gain. |
| BC-P05 Quantification of the uplift (% variation per hectare) |
EFF-C-113
Update of the Ecological Coherence Indicator (ITCE)
|
Related match | Indicative (55%) | The update of the ITCE quantifies the progression of ecological coherence. |
| BC-P06 Alignment with national/local conservation objectives and habitats |
EFF-C-061
Ecological continuities and habitat characterisation
|
Close match | High (80%) | The characterisation of habitats and continuities anchors local ecological objectives. |
| BC-P06 Alignment with national/local conservation objectives and habitats |
EFF-C-064
Choice of the plant palette
|
Close match | Medium (70%) | The choice of the plant palette responds to local ecological issues. |
| BC-P06 Alignment with national/local conservation objectives and habitats |
EFF-C-062
Areas set aside for biodiversity
|
Close match | Medium (70%) | Set-aside areas target habitat-conservation objectives. |
| BC-P06 Alignment with national/local conservation objectives and habitats |
EFF-C-103
Implementation of a Structured Biodiversity Area (EBS)
|
Related match | Medium (60%) | The Structured Biodiversity Area materialises a managed target habitat. |
| BC-P07 MRV: periodic monitoring repeated at the same sampling points |
EFF-C-037
Flora monitoring
|
Close match | High (85%) | Flora monitoring constitutes a repeated MRV. |
| BC-P07 MRV: periodic monitoring repeated at the same sampling points |
EFF-C-044
Fauna monitoring
|
Close match | High (85%) | Fauna monitoring constitutes a repeated MRV. |
| BC-P07 MRV: periodic monitoring repeated at the same sampling points |
EFF-C-046
Monitoring of shelters
|
Close match | Medium (70%) | Shelter monitoring is periodic monitoring. |
| BC-P07 MRV: periodic monitoring repeated at the same sampling points |
EFF-C-030
Methodology for monitoring soil ecological quality
|
Close match | Medium (70%) | The methodology for monitoring soil ecological quality formalises an edaphic MRV. |
| BC-P07 MRV: periodic monitoring repeated at the same sampling points |
EFF-C-041
Meter readings
|
Related match | Indicative (50%) | Meter readings illustrate the periodic monitoring of resources. |
| BC-P08 Independent third-party verification |
EFF-C-124
Effinature ecological assessment: End of operation
|
Close match | High (80%) | The end-of-operation ecological assessment is the project's summary third-party verification. |
| BC-P08 Independent third-party verification |
EFF-C-092
Adherence to the Effinature ecological charter
|
Related match | Indicative (50%) | Adherence to the charter frames the commitment subject to third-party certification. |
| BC-P08 Independent third-party verification |
EFF-C-114
Worksite monitoring
|
Related match | Indicative (50%) | Worksite monitoring feeds the independent control of the works. |
| BC-P09 Permanence / durability of gains (long-term commitment) |
EFF-C-065
Plant-heritage management plan
|
Close match | High (80%) | The plant-heritage management plan guarantees the durability of the gains. |
| BC-P09 Permanence / durability of gains (long-term commitment) |
EFF-C-069
Sustainable management of plant heritage
|
Close match | High (80%) | The sustainable management of plant heritage supports ecological permanence. |
| BC-P09 Permanence / durability of gains (long-term commitment) |
EFF-C-092
Adherence to the Effinature ecological charter
|
Close match | Medium (70%) | Adherence to the ecological charter materialises a durable commitment. |
| BC-P09 Permanence / durability of gains (long-term commitment) |
EFF-C-057
Sustainable soil management
|
Related match | Medium (60%) | The sustainable management of soils contributes to the permanence of ecological functions. |
| BC-P09 Permanence / durability of gains (long-term commitment) |
EFF-C-068
Sustainable stormwater management
|
Related match | Indicative (55%) | The sustainable management of stormwater perpetuates hydrological functions. |
| BC-P10 Leakage management and displaced effects |
EFF-C-025
Earthworks / land-clearing operations method
|
Related match | Indicative (50%) | The earthworks/land-clearing method limits impacts displaced outside the footprint. |
| BC-P10 Leakage management and displaced effects |
EFF-C-104
Green-waste management
|
Related match | Indicative (45%) | Green-waste management avoids the transfer of impacts (EVEE) to the exterior. |
| BC-P10 Leakage management and displaced effects |
EFF-C-102
Discovery of invasive alien plant species (EVEE) during works
|
Related match | Indicative (45%) | The management of EVEE on the worksite prevents off-site propagation. |
| BC-P11 Buffer reserve and management of reversions/risks |
EFF-C-107
Health-status validation of installed plants
|
Related match | Indicative (45%) | The validation of the health status of installed plants mitigates the risk of reversion (mortality). |
| BC-P11 Buffer reserve and management of reversions/risks |
EFF-C-109
Preventive measures
|
Related match | Indicative (40%) | Prevention measures reduce the risks of loss of gains. |
| BC-P15 Stakeholder engagement and awareness |
EFF-C-091
Biodiversity awareness
|
Close match | Medium (75%) | Biodiversity awareness engages stakeholders. |
| BC-P15 Stakeholder engagement and awareness |
EFF-C-089
Social bond and awareness
|
Close match | Medium (70%) | Social bonding and awareness involve users. |
| BC-P15 Stakeholder engagement and awareness |
EFF-C-049
Awareness-raising meeting
|
Close match | Medium (70%) | The awareness meeting formalises stakeholder engagement. |
| BC-P15 Stakeholder engagement and awareness |
EFF-C-050
Users made aware by the Biodiversity Partner
|
Related match | Medium (60%) | Users made aware by the Biodiversity Partner reflect participation. |
| BC-P16 Skills and qualification of measurement/management teams |
EFF-C-094
Teams professional skills
|
Close match | High (80%) | The teams' professional skills guarantee the quality of measures/management. |
| BC-P16 Skills and qualification of measurement/management teams |
EFF-C-121
Proven professional skills of the teams
|
Close match | High (80%) | The teams' proven skills correspond to the qualification requirement. |
| BC-P16 Skills and qualification of measurement/management teams |
EFF-C-095
Hydrological-engineering skills
|
Close match | Medium (70%) | Skills in hydrological engineering qualify the water measures. |
| BC-P16 Skills and qualification of measurement/management teams |
EFF-C-120
Training and accreditation of the Biodiversity Partner
|
Close match | Medium (70%) | The training and accreditation of the Biodiversity Partner ensure the competence of the monitoring. |
| BC-P16 Skills and qualification of measurement/management teams |
EFF-C-096
Beekeeper skills
|
Related match | Indicative (55%) | The beekeeper's skills qualify a specialised component. |
| BC-P17 Transparency and traceable documentation of the project |
EFF-C-124
Effinature ecological assessment: End of operation
|
Close match | High (80%) | The end-of-operation ecological assessment documents and makes the project traceable. |
| BC-P17 Transparency and traceable documentation of the project |
EFF-C-065
Plant-heritage management plan
|
Related match | Indicative (55%) | The management plan documents the monitoring commitments. |
| BC-P17 Transparency and traceable documentation of the project |
EFF-C-039
Water-resource optimisation report
|
Related match | Indicative (50%) | The water-resource optimisation report formalises the traceable documentation. |
| BC-P18 Investment / financing of long-term conservation |
EFF-C-123
Estimate of investments in favour of biodiversity
|
Close match | Medium (75%) | The estimate of investments in favour of biodiversity quantifies the dedicated funding. |
Source & licence
- Publisher : IRICE (groupe NORMAXIS)
- Accreditation : Cofrac (Comité français d'accréditation) n°5-0655 rév. 1 (NF EN ISO/IEC 17065:2012), scope at www.cofrac.fr
- Dataset version : 9.1
- Licence : CC BY-ND 4.0